City of Nowthen · Money
Budget items
Dollar figures the system pulled from meeting packets, minutes, and motions, with one row per spending item, grouped by department. When the bundle could match the amount to a motion, the council's vote is shown inline.
Showing 523 items. The amounts are not added up because this list mixes estimates, budgets, assessments, revenue, and approved spending.
Roads & infrastructure
523 items
Roads & infrastructureF4$3.30MFY ?
- Amount
- $3,300,000 USD
- Fiscal year
- unknown
- Category
- estimate
- Fund / bucket
- Road improvement needs estimate (prior reference)
Context: Road improvement backlog estimate referenced from the 2012 study discussion ("we needed 3.3 million").
No council approval is on record yet.
Evidence
From the Tuesday, August 8, 2017 City Council Meeting.
Roads & infrastructureFIN-027 Road improvement issue bonds 2029$3.25MFY 2029
- Amount
- $3,245,522 USD
- Fiscal year
- 2029
- Category
- debt service
- Fund / bucket
- Road improvement fund
Context: Issue bonds source shown for 2029 road improvement fund financial planning.
No council approval is on record yet.
Evidence
From the Monday, May 6, 2024 Meeting City Council Work Session.
Roads & infrastructureRoad improvements bond discussed$2.58MFY 2021
- Amount
- $2,575,000 USD
- Fiscal year
- 2021
- Category
- debt service
- Fund / bucket
- Road Improvements bond
Context: The minutes say the equipment bond would be part of the road improvement bond.
No council approval is on record yet.
Evidence
From the Tuesday, July 20, 2021 Meeting City Council Work Session.
Roads & infrastructureFIN-1$2.44MFY 2024
- Amount
- $2,441,039.52 USD
- Fiscal year
- 2024
- Category
- contract
- Fund / bucket
- GMH Asphalt Corporation accepted bid
Context: Accepted and approved bid for the improvement project, contingent on GMH Asphalt Corporation entering into a contract with the City of Ramsey.
Council vote · Passed
MOTION BY COUNCIL MEMBER RAINVILLE SECONDED BY BREYEN TO APPROVE RESOLUTION 2024-XX ACCEPTING BID AND AWARDING CONTRACT FOR THE IMPROVEMENT PROJECT WACO STREET, WACO DRIVE, 182ND AVENUE, AND VENTRE LANE.
moved by Rainville, seconded by Breyen
Evidence
From the Tuesday, May 21, 2024 Meeting City Council Public Hearing.
Roads & infrastructureFIN-012 Jasper St. NW project sheet$2.16MFY 2029
- Amount
- $2,158,700 USD
- Fiscal year
- 2029
- Category
- capital project
- Fund / bucket
- Road improvement fund
Context: Reconstruction of Jasper St NW, including widening.
No council approval is on record yet.
Evidence
From the Monday, May 6, 2024 Meeting City Council Work Session.
Roads & infrastructureFIN-032 RIP table 2029$2.16MFY 2029
- Amount
- $2,158,688 USD
- Fiscal year
- 2029
- Category
- capital project
- Fund / bucket
- Road improvement fund
Context: RIP use shown in the road improvement fund financial-planning table for 2029.
No council approval is on record yet.
Evidence
From the Monday, May 6, 2024 Meeting City Council Work Session.
Roads & infrastructureF1$2.00MFY 2012
- Amount
- $2,000,000 USD
- Fiscal year
- 2012
- Category
- estimate
- Fund / bucket
- Viking Blvd 2012 project
Context: Anoka County Viking Blvd project estimated cost.
No council approval is on record yet.
Evidence
From the Wednesday, November 9, 2011 City Council Meeting.
Roads & infrastructureFIN-025 Road improvement issue bonds 2025$1.89MFY 2025
- Amount
- $1,890,970 USD
- Fiscal year
- 2025
- Category
- debt service
- Fund / bucket
- Road improvement fund
Context: Issue bonds source shown for 2025 road improvement fund financial planning.
No council approval is on record yet.
Evidence
From the Monday, May 6, 2024 Meeting City Council Work Session.
Roads & infrastructureJasper St. NW reconstruction$1.83MFY 2028
- Amount
- $1,826,800 USD
- Fiscal year
- 2028
- Category
- capital project
- Fund / bucket
- Road Improvements
Context: 2028 Jasper Street NW reconstruction in the capital plan.
Council vote · Passed
MOTION BY COUNCIL MEMBER RAINVILLE, SECONDED BY BREYEN TO ACCEPT THE AMENDED CONSENT AGENDA.
moved by Rainville, seconded by Breyen
Evidence
From the Tuesday, August 8, 2023 Meeting City Council Meeting.
Roads & infrastructureFIN-026 Road improvement issue bonds 2027$1.82MFY 2027
- Amount
- $1,815,572 USD
- Fiscal year
- 2027
- Category
- debt service
- Fund / bucket
- Road improvement fund
Context: Issue bonds source shown for 2027 road improvement fund financial planning.
No council approval is on record yet.
Evidence
From the Monday, May 6, 2024 Meeting City Council Work Session.
Roads & infrastructureRoad Improvement Fund planned bond issue$1.75MFY 2025
- Amount
- $1,750,000 USD
- Fiscal year
- 2025
- Category
- debt service
- Fund / bucket
- Road Improvement Fund
Context: Road Improvement Fund planned 2025 bond issue.
Council vote · Passed
MOTION BY COUNCIL MEMBER RAINVILLE, SECONDED BY BREYEN TO ACCEPT THE AMENDED CONSENT AGENDA.
moved by Rainville, seconded by Breyen
Evidence
From the Tuesday, August 8, 2023 Meeting City Council Meeting.
Roads & infrastructureRoad Improvement Fund planned bond issue$1.50MFY 2027
- Amount
- $1,500,000 USD
- Fiscal year
- 2027
- Category
- debt service
- Fund / bucket
- Road Improvement Fund
Context: Road Improvement Fund planned 2027 bond issue.
Council vote · Passed
MOTION BY COUNCIL MEMBER RAINVILLE, SECONDED BY BREYEN TO ACCEPT THE AMENDED CONSENT AGENDA.
moved by Rainville, seconded by Breyen
Evidence
From the Tuesday, August 8, 2023 Meeting City Council Meeting.
Roads & infrastructureF9$1.26MFY 2019
- Amount
- $1,258,977.67 USD
- Fiscal year
- 2019
- Category
- estimate
- Fund / bucket
- Asphalt Surface Technologies Corp.
Context: Non-selected bid received for the 2019 Road Improvement Projects.
No council approval is on record yet.
Evidence
From the Tuesday, May 14, 2019 Meeting City Council Public Hearing.
Roads & infrastructureF4$1.26MFY 2019
- Amount
- $1,258,977.67 USD
- Fiscal year
- 2019
- Category
- estimate
- Fund / bucket
- 2019 Street Improvements total bid
Context: Asphalt Surface Technologies, Corp. bid total listed for comparison.
No council approval is on record yet.
Evidence
From the Tuesday, April 23, 2019 Meeting Special City Council Meeting.
Roads & infrastructureDetailed 2020 Road Improvement Fund expenditures$1.25MFY 2020
- Amount
- $1,253,095 USD
- Fiscal year
- 2020
- Category
- capital project
- Fund / bucket
- Road Improvement Fund expenditures
Context: Detailed 2020 budget amount for proposed road improvements.
Council vote · Passed
MOTION TO APPROVE RESOLUTION 2019-60 - A RESOLUTION RELATING TO ADOPTION OF A PROPOSED 2020 BUDGET AND CERTIFYING A PRELIMINARY PROPERTY LEVY COLLECTIBLE IN 2020, BY BREYEN, SECONDED BY BLAKE; ALL IN FAVOR, MOTION CARRIES.
moved by BREYEN, seconded by BLAKE
From the Tuesday, September 10, 2019 Meeting City Council Meeting.
Roads & infrastructureF8$1.21MFY 2019
- Amount
- $1,212,378.84 USD
- Fiscal year
- 2019
- Category
- estimate
- Fund / bucket
- Park Construction Company
Context: Non-selected bid received for the 2019 Road Improvement Projects.
No council approval is on record yet.
Evidence
From the Tuesday, May 14, 2019 Meeting City Council Public Hearing.
Roads & infrastructure2021 road improvement program$1.20MFY 2021
- Amount
- $1,200,000 USD
- Fiscal year
- 2021
- Category
- capital project
- Fund / bucket
- Road Improvement Fund
Context: 2021 road improvement program line item in the capital improvement plan.
No council approval is on record yet.
Evidence
From the Tuesday, July 20, 2021 Meeting City Council Work Session.
Roads & infrastructureEstimated 2020 road improvements$1.20MFY 2020
- Amount
- $1,200,000 USD
- Fiscal year
- 2020
- Category
- estimate
- Fund / bucket
- Road Improvement Fund
Context: Estimated 2020 road improvement cost stated in the budget presentation.
Council vote · Passed
MOTION TO APPROVE RESOLUTION 2019-60 - A RESOLUTION RELATING TO ADOPTION OF A PROPOSED 2020 BUDGET AND CERTIFYING A PRELIMINARY PROPERTY LEVY COLLECTIBLE IN 2020, BY BREYEN, SECONDED BY BLAKE; ALL IN FAVOR, MOTION CARRIES.
moved by BREYEN, seconded by BLAKE
Evidence
From the Tuesday, September 10, 2019 Meeting City Council Meeting.
Roads & infrastructureF7$1.19MFY 2019
- Amount
- $1,186,040 USD
- Fiscal year
- 2019
- Category
- estimate
- Fund / bucket
- OMG Midwest, Inc.
Context: Non-selected bid received for the 2019 Road Improvement Projects.
No council approval is on record yet.
Evidence
From the Tuesday, May 14, 2019 Meeting City Council Public Hearing.
Roads & infrastructure2027 road improvement bond issue$1.14MFY 2027
- Amount
- $1,140,000 USD
- Fiscal year
- 2027
- Category
- debt service
- Fund / bucket
- Road Improvement bond issue
Context: Bonds for 2026/2027 road improvements.
Council vote · Passed
Make a motion to adopt the 2027 CIP and ERP with direction to the city staff of investigating the feasibility of alternatively to the uh proposed well new well uh looking at using a farmer's irrigation well that has been offered to the city previously.
moved by Glaser, seconded by Hybben
Evidence
From the Tuesday, June 9, 2026 City Council Meeting.
Roads & infrastructureFIN-029 2025 RIP table$1.12MFY 2025
- Amount
- $1,120,063 USD
- Fiscal year
- 2025
- Category
- capital project
- Fund / bucket
- Road improvement fund
Context: 2025 RIP use shown in the road improvement fund financial-planning table.
No council approval is on record yet.
Evidence
From the Monday, May 6, 2024 Meeting City Council Work Session.
Roads & infrastructureRoad improvement bond issue$1.08MFY 2027
- Amount
- $1,084,000 USD
- Fiscal year
- 2027
- Category
- debt service
- Fund / bucket
- Road Improvements
Context: Proposed 2027 road improvement bond issue.
No council approval is on record yet.
Evidence
From the Thursday, May 28, 2026 City Council Worksession.
Roads & infrastructureF6$1.08MFY 2019
- Amount
- $1,075,157.6 USD
- Fiscal year
- 2019
- Category
- contract
- Fund / bucket
- North Valley, Inc.
Context: Lowest responsible bid accepted for the 2019 Road Improvement Projects, contingent on contract entry and attorney approval.
Council vote · Passed
Motion to adopt Resolution 2019-47 Accepting Bid for 2019 Road Improvement Project and Awarding the Contract
moved by Rainville, seconded by Breyen
From the Tuesday, May 14, 2019 Meeting City Council Public Hearing.
Roads & infrastructureFIN-031 RIP table 2028$1.03MFY 2028
- Amount
- $1,030,400 USD
- Fiscal year
- 2028
- Category
- capital project
- Fund / bucket
- Road improvement fund
Context: RIP use shown in the road improvement fund financial-planning table for 2028.
No council approval is on record yet.
Evidence
From the Monday, May 6, 2024 Meeting City Council Work Session.
Roads & infrastructureLong-term annual road improvement target$1.00MFY ?
- Amount
- $1,000,000 USD
- Fiscal year
- unknown
- Category
- capital project
- Fund / bucket
- Road Improvements
Context: Long-term annual road improvement spending target described in the plan.
No council approval is on record yet.
Evidence
From the Thursday, May 28, 2026 City Council Worksession.
Roads & infrastructureEstimated annual road project burden discussed$1.00MFY ?
- Amount
- $1,000,000 USD
- Fiscal year
- unknown
- Category
- estimate
- Fund / bucket
- Road project cost discussion
Context: Finance Consultant Yager said the levy could not sustain one road project a year at one million dollars per year.
No council approval is on record yet.
Evidence
From the Monday, July 29, 2024 Meeting City Council Work Session.
Roads & infrastructureRoad improvement bond issue 2025$978kFY 2025
- Amount
- $978,040 USD
- Fiscal year
- 2025
- Category
- debt service
- Fund / bucket
- Road Improvement Fund bond issue
Context: 2025 Road Improvement Fund bond issue revenue.
No council approval is on record yet.
Evidence
From the Monday, September 16, 2024 Meeting City Council Work Session.
Roads & infrastructureRoad Improvement Fund total expenditures$924kFY 2022
- Amount
- $924,000 USD
- Fiscal year
- 2022
- Category
- capital project
- Fund / bucket
- Road Improvement Fund
Context: 2022 Road Improvement Fund total expenditures.
No council approval is on record yet.
Evidence
From the Monday, September 27, 2021 Meeting City Council Work Session.
Roads & infrastructureRoad Improvement appropriation$924kFY 2022
- Amount
- $924,000 USD
- Fiscal year
- 2022
- Category
- capital project
- Fund / bucket
- Proposed 2022 budget appropriations
Context: Road Improvement appropriation in Resolution 2021-30.
No council approval is on record yet.
Evidence
From the Monday, September 27, 2021 Meeting City Council Work Session.
Roads & infrastructureFY2022 road improvement fund expenditures$924kFY 2022
- Amount
- $924,000 USD
- Fiscal year
- 2022
- Category
- capital project
- Fund / bucket
- Road Improvement Fund
Context: Proposed 2022 road improvement fund total expenditures.
No council approval is on record yet.
Evidence
From the Monday, September 13, 2021 Meeting City Council Work Session.
Roads & infrastructureRoad Improvement Fund improvements line item$914kFY 2022
- Amount
- $914,000 USD
- Fiscal year
- 2022
- Category
- capital project
- Fund / bucket
- Road Improvement Fund
Context: 2022 Road Improvement Fund improvements line item.
No council approval is on record yet.
Evidence
From the Monday, September 27, 2021 Meeting City Council Work Session.
Roads & infrastructureFY2022 road improvements$914kFY 2022
- Amount
- $914,000 USD
- Fiscal year
- 2022
- Category
- capital project
- Fund / bucket
- Road Improvement Fund
Context: Proposed 2022 road improvement project line.
No council approval is on record yet.
From the Monday, September 13, 2021 Meeting City Council Work Session.
Roads & infrastructureF21$912kFY 2024
- Amount
- $912,000 USD
- Fiscal year
- 2024
- Category
- capital project
- Fund / bucket
- Rogers Lake area road improvements
Context: Anticipated 2024 road improvement cost for the Rogers Lake area, including Wo Street and Wo Drive as transcribed.
Council vote · Passed
approval of 20 22371 adopting the final LEL for 2024 and approval of resolution 20272 adopting the budget
moved by R, seconded by counc Bryan
Evidence
From the Tuesday, December 12, 2023 Meeting City Council Public Hearing.
Roads & infrastructure2022 road improvement project planning amount$900kFY 2022
- Amount
- $900,000 USD
- Fiscal year
- 2022
- Category
- capital project
- Fund / bucket
- Road Improvement Fund
Context: Road improvement planning amount for the next budget cycle.
No council approval is on record yet.
From the Tuesday, July 20, 2021 Meeting City Council Work Session.
Roads & infrastructureFIN-030 2026 RIP table$898kFY 2026
- Amount
- $897,794 USD
- Fiscal year
- 2026
- Category
- capital project
- Fund / bucket
- Road improvement fund
Context: 2026 RIP use shown in the road improvement fund financial-planning table.
No council approval is on record yet.
Evidence
From the Monday, May 6, 2024 Meeting City Council Work Session.
Roads & infrastructureROGERS LAKE PROJECT ESTIMATE$864kFY 2021
- Amount
- $863,763 USD
- Fiscal year
- 2021
- Category
- estimate
- Fund / bucket
- Rogers Lake area road project
Context: Total estimated project cost used when notices were sent for the Rogers Lake area road project.
No council approval is on record yet.
Evidence
From the Monday, May 24, 2021 Meeting City Council Public Hearing.
Roads & infrastructure2030 Road Improvement Project CIP sheet$861kFY 2030
- Amount
- $861,000 USD
- Fiscal year
- 2030
- Category
- capital project
- Fund / bucket
- Road Improvement Fund
Context: 2030 road improvement project budget impact in the CIP project sheet.
No council approval is on record yet.
Evidence
From the Wednesday, April 23, 2025 Meeting City Council Meeting.
Roads & infrastructureFf 4$855kFY 2026
- Amount
- $855,000 USD
- Fiscal year
- 2026
- Category
- capital project
- Fund / bucket
- 2026 CIP - Public Works equipment
Context: Public Works equipment budgeted in the 2026 Capital Improvement Plan (CIP).
No council approval is on record yet.
Evidence
From the Monday, August 25, 2025 Oak Grove City Council Work Session — 2025-08-25.
Roads & infrastructureF4$848kFY 2021
- Amount
- $848,150 USD
- Fiscal year
- 2021
- Category
- estimate
- Fund / bucket
- Rogers Lake Area total estimated project cost
Context: Total estimated cost for the Rogers Lake Area road improvement project.
No council approval is on record yet.
Evidence
From the Wednesday, December 9, 2020 Meeting City Council Public Hearing.
Roads & infrastructureF5$840kFY 2019
- Amount
- $840,480 USD
- Fiscal year
- 2019
- Category
- estimate
- Fund / bucket
- Old Viking Blvd NW
Context: Agenda preliminary estimate for the proposed 2019 road improvement to Old Viking Blvd NW.
No council approval is on record yet.
Evidence
From the Tuesday, May 14, 2019 Meeting City Council Public Hearing.
Roads & infrastructureF-3$840kFY 2019
- Amount
- $840,480 USD
- Fiscal year
- 2019
- Category
- estimate
- Fund / bucket
- Old Viking Blvd. NW road improvement
Context: Preliminary estimate for the proposed 2019 Old Viking Blvd. NW road improvement.
Council vote · Passed
Resolution 2019-10, Ordering the Improvements for Old Viking Blvd NW - Motion by Rainville, 2nd by Breyen;
moved by Rainville, seconded by Breyen
Evidence
From the Monday, January 14, 2019 Meeting City Council Public Hearing.
Roads & infrastructure2030 RIP Autumn Acres$820kFY 2030
- Amount
- $820,000 USD
- Fiscal year
- 2030
- Category
- capital project
- Fund / bucket
- Road Improvements
Context: 2030 Road Improvement Project for Autumn Acres.
No council approval is on record yet.
Evidence
From the Thursday, May 28, 2026 City Council Worksession.
Roads & infrastructure2030 Road Improvement Projects$820kFY 2030
- Amount
- $820,000 USD
- Fiscal year
- 2030
- Category
- capital project
- Fund / bucket
- Road Improvement
Context: Full depth reclamation and paving of Autumn Acres Phase I due to pavement failure.
No council approval is on record yet.
Evidence
From the Tuesday, May 19, 2026 City Council Meeting.
Roads & infrastructureRoad improvement project 2030$820kFY 2030
- Amount
- $820,000 USD
- Fiscal year
- 2030
- Category
- capital project
- Fund / bucket
- Road Improvement
Context: 2030 Road Improvement Projects for Autumn Acres Phase I.
No council approval is on record yet.
Evidence
From the Tuesday, May 19, 2026 City Council Worksession.
Roads & infrastructure2030 Road Improvement Project engineer estimate$820kFY 2030
- Amount
- $820,000 USD
- Fiscal year
- 2030
- Category
- estimate
- Fund / bucket
- Road Improvement Fund
Context: Engineer preliminary estimate for 2030 Autumn Acres Phase 1 work.
No council approval is on record yet.
Evidence
From the Wednesday, April 23, 2025 Meeting City Council Meeting.
Roads & infrastructureF20$800kFY 2019
- Amount
- $800,000 USD
- Fiscal year
- 2019
- Category
- estimate
- Fund / bucket
- Old Viking Blvd current road cost discussion
Context: Mayor Pilon contrasted the earlier Old Viking Blvd estimate with the current cost level.
No council approval is on record yet.
Evidence
From the Tuesday, May 14, 2019 Meeting City Council Public Hearing.
Roads & infrastructureF2$800kFY ?
- Amount
- $800,000 USD
- Fiscal year
- unknown
- Category
- estimate
- Fund / bucket
- Rogers Lake area repair project
Context: Estimated cost for Rogers Lake area road improvement project discussed for potential bonding.
No council approval is on record yet.
Evidence
From the Tuesday, May 8, 2018 City Council Meeting.
Roads & infrastructure2029 Road Improvement Project CIP sheet$788kFY 2029
- Amount
- $787,500 USD
- Fiscal year
- 2029
- Category
- capital project
- Fund / bucket
- Road Improvement Fund
Context: 2029 road improvement project budget impact in the CIP project sheet.
No council approval is on record yet.
Evidence
From the Wednesday, April 23, 2025 Meeting City Council Meeting.
Roads & infrastructure2028 Road Improvement Project CIP sheet$788kFY 2028
- Amount
- $787,500 USD
- Fiscal year
- 2028
- Category
- capital project
- Fund / bucket
- Road Improvement Fund
Context: 2028 road improvement project budget impact in the CIP project sheet.
No council approval is on record yet.
Evidence
From the Wednesday, April 23, 2025 Meeting City Council Meeting.
Roads & infrastructure2023 Street Project$782kFY 2023
- Amount
- $781,720 USD
- Fiscal year
- 2023
- Category
- capital project
- Fund / bucket
- 2023 Street Project
Context: Proposed 2023 road improvement project total.
No council approval is on record yet.
Evidence
From the Monday, August 29, 2022 Meeting City Council Work Session.
Roads & infrastructureStreet project 2023$782kFY 2023
- Amount
- $781,720 USD
- Fiscal year
- 2023
- Category
- capital project
- Fund / bucket
- 2023 Street Project
Context: Proposed 2023 road improvement fund item for the 2023 Street Project.
No council approval is on record yet.
Evidence
From the Monday, July 25, 2022 Meeting City Council Work Session.
Roads & infrastructureF13$755kFY ?
- Amount
- $755,000 USD
- Fiscal year
- unknown
- Category
- estimate
- Fund / bucket
- 2023 road improvements (cycle options)
Context: Estimated annual cost for 20-year road improvement cycle.
No council approval is on record yet.
Evidence
From the Monday, October 31, 2022 Oak Grove City Council — 2022-10-31.
Roads & infrastructureRogers Lake road project preliminary estimate$752kFY ?
- Amount
- $752,000 USD
- Fiscal year
- unknown
- Category
- estimate
- Fund / bucket
- Waco Street, Waco Drive, 182nd Lane & Ventre Street project
Context: Preliminary total estimated project cost before bids.
Council vote · Passed
MOTION BY CM BREYEN, SECONDED BY MAYOR PILON TO ADOPT RESOLUTION 2024-XX REGARDING THE ROGERS LAKE ROAD PROJECT ASSESSMENT.
moved by Breyen, seconded by Pilon
Evidence
From the Tuesday, October 8, 2024 Meeting City Council Meeting.
Roads & infrastructureFIN-028 2024 RIP table$752kFY 2024
- Amount
- $752,000 USD
- Fiscal year
- 2024
- Category
- capital project
- Fund / bucket
- Road improvement fund
Context: 2024 RIP use shown in the road improvement fund financial-planning table.
No council approval is on record yet.
Evidence
From the Monday, May 6, 2024 Meeting City Council Work Session.
Roads & infrastructureFIN-004$752kFY 2024
- Amount
- $752,000 USD
- Fiscal year
- 2024
- Category
- capital project
- Fund / bucket
- Waco Street/Waco Drive/182nd Avenue/Ventre Lane project estimate
Context: Engineer estimate for the Rogers Lake Road/Waco project, including engineering and construction.
Council vote · Passed
MOTION BY COUNCIL MEMBER RAINVILLE SECONDED BY ALDERS TO APPROVE RESOLULTION 2024-XX APPROVING PLANS AND SPECIFICATIONS AND ORDERING ADVERTISEMENTS FOR BIDS.
moved by Rainville, seconded by Alders
From the Tuesday, April 9, 2024 Meeting City Council Meeting.
Roads & infrastructure2029 RIP Burns Commercial and Burns Town Center$750kFY 2029
- Amount
- $750,000 USD
- Fiscal year
- 2029
- Category
- capital project
- Fund / bucket
- Road Improvements
Context: 2029 Road Improvement Project for Burns Commercial and Burns Town Center.
No council approval is on record yet.
Evidence
From the Thursday, May 28, 2026 City Council Worksession.
Roads & infrastructure2029 Road Improvement Project$750kFY 2029
- Amount
- $750,000 USD
- Fiscal year
- 2029
- Category
- capital project
- Fund / bucket
- Road Improvement
Context: Full depth reclamation and paving of Burns Commercial Park & Burns Town Center due to pavement failure.
No council approval is on record yet.
Evidence
From the Tuesday, May 19, 2026 City Council Meeting.
Roads & infrastructureRoad improvement project 2029$750kFY 2029
- Amount
- $750,000 USD
- Fiscal year
- 2029
- Category
- capital project
- Fund / bucket
- Road Improvement
Context: 2029 Road Improvement Project for Burns Commercial Park and Burns Town Center.
No council approval is on record yet.
Evidence
From the Tuesday, May 19, 2026 City Council Worksession.
Roads & infrastructure2029 Road Improvement Project engineer estimate$750kFY 2029
- Amount
- $750,000 USD
- Fiscal year
- 2029
- Category
- estimate
- Fund / bucket
- Road Improvement Fund
Context: Engineer preliminary estimate for 2029 Burns Commercial Park and Burns Town Center work.
No council approval is on record yet.
Evidence
From the Wednesday, April 23, 2025 Meeting City Council Meeting.
Roads & infrastructureProposed 2026 road improvement capital budget$734kFY 2026
- Amount
- $734,175 USD
- Fiscal year
- 2026
- Category
- capital project
- Fund / bucket
- Road Improvement Capital budget
Context: Packet resolution proposed 2026 road improvement capital budget amount.
Council vote · Passed
MOTION BY COUNCIL MEMBER RAINVILLE, SECONDED BY COUNCIL MEMBER SWENSON, TO ADOPT RESOLUTION 2025-88 ADOPTING THE PRELIMINARY 2026 LEVY AND BUDGET WITH THE UNDERSTANDING THAT COUNCIL HAS AGREED TO REVISIT EXPENDITURES CLOSER TO THE END OF THE YEAR TO IMPLEMENT ADDITIONAL REDUCTIONS.
moved by RAINVILLE, seconded by SWENSON
Evidence
From the Tuesday, September 9, 2025 City Council Meeting.
Roads & infrastructureproposed 2026 road improvement fund expenditures$734kFY 2026
- Amount
- $734,175 USD
- Fiscal year
- 2026
- Category
- capital project
- Fund / bucket
- road improvement fund
Context: Proposed 2026 Road Improvement Fund total expenditures.
No council approval is on record yet.
Evidence
From the Wednesday, August 20, 2025 City Council Budget Work Session.
Roads & infrastructure2031 Road Improvement Projects$700kFY 2031
- Amount
- $700,000 USD
- Fiscal year
- 2031
- Category
- capital project
- Fund / bucket
- Road Improvement
Context: Full depth reclamation and paving of Autumn Acres Phase II due to pavement failure.
No council approval is on record yet.
Evidence
From the Tuesday, May 19, 2026 City Council Meeting.
Roads & infrastructureRoad improvement project 2031$700kFY 2031
- Amount
- $700,000 USD
- Fiscal year
- 2031
- Category
- capital project
- Fund / bucket
- Road Improvement
Context: 2031 Road Improvement Projects for Autumn Acres Phase II.
No council approval is on record yet.
Evidence
From the Tuesday, May 19, 2026 City Council Worksession.
Roads & infrastructureFf 31$700kFY 2024
- Amount
- $700,000 USD
- Fiscal year
- 2024
- Category
- budget
- Fund / bucket
- Road improvement budget
Context: Budgeted amount referenced for 2024 Street Improvement Project (not including engineering fees context).
No council approval is on record yet.
Evidence
From the Monday, February 26, 2024 Oak Grove City Council — 2024-02-26.
Roads & infrastructureF14$686kFY ?
- Amount
- $686,000 USD
- Fiscal year
- unknown
- Category
- estimate
- Fund / bucket
- 2023 road improvements (cycle options)
Context: Estimated annual cost for 22-year road improvement cycle.
No council approval is on record yet.
Evidence
From the Monday, October 31, 2022 Oak Grove City Council — 2022-10-31.
Roads & infrastructureF15$604kFY ?
- Amount
- $604,000 USD
- Fiscal year
- unknown
- Category
- estimate
- Fund / bucket
- 2023 road improvements (cycle options)
Context: Estimated annual cost for 25-year road improvement cycle.
No council approval is on record yet.
Evidence
From the Monday, October 31, 2022 Oak Grove City Council — 2022-10-31.
Roads & infrastructureRogers Lake Road total project cost estimate$595kFY 2024
- Amount
- $595,400 USD
- Fiscal year
- 2024
- Category
- assessment
- Fund / bucket
- Rogers Lake Road total project cost estimate
Context: Project cost cited in assessment-hearing notice for the road project for which council declined to offer a deferment policy.
Council vote · Passed
MOTION BY COUNCIL MEMBER RAINVILLE, SECONDED BY BREYEN TO AGREE WITH ATTORNEY AND DO NOT OFFER A DEFERMENT POLICY ON THE ROGERS LAKE ROAD PROJECT.
moved by Rainville, seconded by Breyen
Evidence
From the Tuesday, June 11, 2024 Meeting City Council Meeting.
Roads & infrastructureFIN-011 Westpahl Country Acres project sheet$586kFY 2027
- Amount
- $585,500 USD
- Fiscal year
- 2027
- Category
- capital project
- Fund / bucket
- Road improvement fund
Context: Full-depth reclamation and paving of Westpahl Country Acres: 229th Ave NW, Argon St NW, Waco St NW.
No council approval is on record yet.
Evidence
From the Monday, May 6, 2024 Meeting City Council Work Session.
Roads & infrastructureproposed 2026 road improvements line$584kFY 2026
- Amount
- $584,175 USD
- Fiscal year
- 2026
- Category
- capital project
- Fund / bucket
- road improvement fund
Context: Proposed 2026 Road Improvement Fund improvements line.
No council approval is on record yet.
Evidence
From the Wednesday, August 20, 2025 City Council Budget Work Session.
Roads & infrastructureRoad improvement plan approx$560kFY 2026
- Amount
- $560,000 USD
- Fiscal year
- 2026
- Category
- capital project
- Fund / bucket
- Road improvement plan
Context: Approximate road improvement plan amount reported during budget presentation.
Council vote · Passed
MOTION BY COUNCIL MEMBER RAINVILLE, SECONDED BY COUNCIL MEMBER SWENSON, TO ADOPT RESOLUTION 2025-88 ADOPTING THE PRELIMINARY 2026 LEVY AND BUDGET WITH THE UNDERSTANDING THAT COUNCIL HAS AGREED TO REVISIT EXPENDITURES CLOSER TO THE END OF THE YEAR TO IMPLEMENT ADDITIONAL REDUCTIONS.
moved by RAINVILLE, seconded by SWENSON
Evidence
From the Tuesday, September 9, 2025 City Council Meeting.
Roads & infrastructurecounty road project amount$560kFY 2026
- Amount
- $560,000 USD
- Fiscal year
- 2026
- Category
- capital project
- Fund / bucket
- road improvement fund
Context: County Project amount shown below the Road Improvement Fund table.
No council approval is on record yet.
Evidence
From the Wednesday, August 20, 2025 City Council Budget Work Session.
Roads & infrastructure2025 Road Improvement Capital budget$555kFY 2025
- Amount
- $555,400 USD
- Fiscal year
- 2025
- Category
- capital project
- Fund / bucket
- Road Improvement Capital
Context: 2025 preliminary Road Improvement Capital budget appropriation.
Council vote · Passed
MOTION BY COUNCIL MEMBER ALDERS, SECONDED BY BREYEN TO ADOPT RESOLUTION 2024- 91 APPROVING THE 2025 PRELIMINARY LEVY AND ADOPT THE 2025 PRELIMARY BUDGET.
moved by ALDERS, seconded by BREYEN
Evidence
From the Monday, September 23, 2024 Meeting City Council Work Session.
Roads & infrastructureRoad improvement total expenditures 2025$555kFY 2025
- Amount
- $555,400 USD
- Fiscal year
- 2025
- Category
- capital project
- Fund / bucket
- Road Improvement Fund total expenditures
Context: 2025 Road Improvement Fund total expenditures.
No council approval is on record yet.
Evidence
From the Monday, September 16, 2024 Meeting City Council Work Session.
Roads & infrastructure2027 Road Improvement Project CIP sheet$546kFY 2027
- Amount
- $546,000 USD
- Fiscal year
- 2027
- Category
- capital project
- Fund / bucket
- Road Improvement Fund
Context: 2027 road improvement project budget impact in the CIP project sheet.
No council approval is on record yet.
Evidence
From the Wednesday, April 23, 2025 Meeting City Council Meeting.
Roads & infrastructureF5$536kFY 2018
- Amount
- $535,940 USD
- Fiscal year
- 2018
- Category
- estimate
- Fund / bucket
- Old Viking Blvd
Context: Old Viking Blvd project total estimated cost.
No council approval is on record yet.
Evidence
From the Tuesday, January 16, 2018 City Council Meeting.
Roads & infrastructureF-7$533kFY 2018
- Amount
- $533,280 USD
- Fiscal year
- 2018
- Category
- estimate
- Fund / bucket
- road_improvement_old_viking_blvd
Context: Old Viking Blvd overlay project engineer’s estimate.
No council approval is on record yet.
From the Tuesday, March 20, 2018 Public Hearing & City Council Meeting.
Roads & infrastructure2027 road improvement project$520kFY 2027
- Amount
- $520,000 USD
- Fiscal year
- 2027
- Category
- capital project
- Fund / bucket
- Road Improvement
Context: 2027 Road Improvement Project for Hunters Meadow, Milestone Ponds, Bailey Estates and Prairie Acres.
Council vote · Passed
Make a motion to adopt the 2027 CIP and ERP with direction to the city staff of investigating the feasibility of alternatively to the uh proposed well new well uh looking at using a farmer's irrigation well that has been offered to the city previously.
moved by Glaser, seconded by Hybben
Evidence
From the Tuesday, June 9, 2026 City Council Meeting.
Roads & infrastructure2027 RIP Hunters Meadow and Milestone ponds$520kFY 2027
- Amount
- $520,000 USD
- Fiscal year
- 2027
- Category
- capital project
- Fund / bucket
- Road Improvements
Context: 2027 Road Improvement Project for Hunters Meadow and Milestone ponds.
No council approval is on record yet.
Evidence
From the Thursday, May 28, 2026 City Council Worksession.
Roads & infrastructure2027 Road Improvement Project$520kFY 2027
- Amount
- $520,000 USD
- Fiscal year
- 2027
- Category
- capital project
- Fund / bucket
- Road Improvement
Context: Bituminous overlays and maintenance on roads near or past their 20-year design life including Hunters Meadow and Milestone Ponds.
No council approval is on record yet.
Evidence
From the Tuesday, May 19, 2026 City Council Meeting.
Roads & infrastructureRoad improvement project 2027$520kFY 2027
- Amount
- $520,000 USD
- Fiscal year
- 2027
- Category
- capital project
- Fund / bucket
- Road Improvement
Context: 2027 Road Improvement Project for Hunter's Meadow, Milestone Ponds, Bailey Estates, and Prairie Acres areas.
No council approval is on record yet.
From the Tuesday, May 19, 2026 City Council Worksession.
Roads & infrastructure2027 Road Improvement Project engineer estimate$520kFY 2027
- Amount
- $520,000 USD
- Fiscal year
- 2027
- Category
- estimate
- Fund / bucket
- Road Improvement Fund
Context: Engineer preliminary estimate for 2027 road improvements.
No council approval is on record yet.
Evidence
From the Wednesday, April 23, 2025 Meeting City Council Meeting.
Roads & infrastructureF15$513kFY 2026
- Amount
- $513,020 USD
- Fiscal year
- 2026
- Category
- debt service
- Fund / bucket
- GO bonds/equipment bonds total budget
Context: Proposed 2026 budget total for listed road improvement and equipment bond lines in the example summary budget comparison.
No council approval is on record yet.
Evidence
From the Thursday, June 5, 2025 Meeting City Council Work Session.
Roads & infrastructure2025 road improvement preliminary estimate$510kFY 2025
- Amount
- $510,000 USD
- Fiscal year
- 2025
- Category
- estimate
- Fund / bucket
- 2025 road improvements
Context: City Engineer's preliminary 2025 road improvement cost estimate.
Council vote · Passed
MOTION BY COUNCIL MEMBER RAINVILLE, SECONDED BY COUNCIL MEMBER BREYEN, TO RECEIVE AND FILE THE 2025, 2026, AND 2027 ROAD IMPROVEMENTS RECOMMENDATIONS, AND DIRECT STAFF TO KEEP THEM ON THE DOCKET FOR WHEN THEY BEGIN CONSIDERATION OF ROAD PROJECTS IN 2025.
moved by Rainville, seconded by Breyen
Evidence
From the Tuesday, November 12, 2024 Meeting City Council Meeting.
Roads & infrastructureF16$503kFY ?
- Amount
- $503,000 USD
- Fiscal year
- unknown
- Category
- estimate
- Fund / bucket
- 2023 road improvements (cycle options)
Context: Estimated annual cost for 30-year road improvement cycle.
No council approval is on record yet.
Evidence
From the Monday, October 31, 2022 Oak Grove City Council — 2022-10-31.
Roads & infrastructure2026 Road Improvement Project$490kFY 2026
- Amount
- $490,000 USD
- Fiscal year
- 2026
- Category
- capital project
- Fund / bucket
- Road Improvement Fund
Context: 2026 road improvement project budget impact and engineer preliminary estimate.
No council approval is on record yet.
From the Wednesday, April 23, 2025 Meeting City Council Meeting.
Roads & infrastructure2026 road improvement preliminary estimate$490kFY 2026
- Amount
- $490,000 USD
- Fiscal year
- 2026
- Category
- estimate
- Fund / bucket
- 2026 road improvements
Context: City Engineer's preliminary 2026 road improvement cost estimate.
Council vote · Passed
MOTION BY COUNCIL MEMBER RAINVILLE, SECONDED BY COUNCIL MEMBER BREYEN, TO RECEIVE AND FILE THE 2025, 2026, AND 2027 ROAD IMPROVEMENTS RECOMMENDATIONS, AND DIRECT STAFF TO KEEP THEM ON THE DOCKET FOR WHEN THEY BEGIN CONSIDERATION OF ROAD PROJECTS IN 2025.
moved by Rainville, seconded by Breyen
Evidence
From the Tuesday, November 12, 2024 Meeting City Council Meeting.
Roads & infrastructurePublic Works total budget$482kFY 2023
- Amount
- $482,010 USD
- Fiscal year
- 2023
- Category
- budget
- Fund / bucket
- Public Works
Context: Proposed 2023 Public Works total.
No council approval is on record yet.
Evidence
From the Monday, August 29, 2022 Meeting City Council Work Session.
Roads & infrastructure2028 RIP 184th and Tiger Street$480kFY 2028
- Amount
- $480,000 USD
- Fiscal year
- 2028
- Category
- capital project
- Fund / bucket
- Road Improvements
Context: 2028 Road Improvement Project for 184th and Tiger Street.
No council approval is on record yet.
Evidence
From the Thursday, May 28, 2026 City Council Worksession.
Roads & infrastructure2028 Road Improvement Project$480kFY 2028
- Amount
- $480,000 USD
- Fiscal year
- 2028
- Category
- capital project
- Fund / bucket
- Road Improvement
Context: Full depth reclamation and re-paving of Burnside Trails due to pavement failure.
No council approval is on record yet.
Evidence
From the Tuesday, May 19, 2026 City Council Meeting.
Roads & infrastructureRoad improvement project 2028$480kFY 2028
- Amount
- $480,000 USD
- Fiscal year
- 2028
- Category
- capital project
- Fund / bucket
- Road Improvement
Context: 2028 Road Improvement Project for Burnside Trails.
No council approval is on record yet.
Evidence
From the Tuesday, May 19, 2026 City Council Worksession.
Roads & infrastructure2028 Road Improvement Project engineer estimate$480kFY 2028
- Amount
- $480,000 USD
- Fiscal year
- 2028
- Category
- estimate
- Fund / bucket
- Road Improvement Fund
Context: Engineer preliminary estimate for 2028 Burnside Trails work.
No council approval is on record yet.
Evidence
From the Wednesday, April 23, 2025 Meeting City Council Meeting.
Roads & infrastructureproposed 2026 public works budget$473kFY 2026
- Amount
- $472,885 USD
- Fiscal year
- 2026
- Category
- budget
- Fund / bucket
- proposed 2026 general fund departments
Context: Proposed 2026 Public Works budget.
No council approval is on record yet.
Evidence
From the Wednesday, August 20, 2025 City Council Budget Work Session.
Roads & infrastructureF27$463kFY 2026
- Amount
- $462,800 USD
- Fiscal year
- 2026
- Category
- capital project
- Fund / bucket
- 2026 Overlay Road Improvement Project total estimated project costs
Context: Amended assessment resolution estimated total project costs, including bonding, engineering, and legal costs.
Council vote · Passed
MOTION BY COUNCIL MEMBER BREYEN, SECONDED BY COUNCIL MEMBER GLASER, TO APPROVE THE CONSENT AGENDA AS AMENDED.
moved by Breyen, seconded by Glaser
Evidence
From the Tuesday, May 12, 2026 City Council Meeting.
Roads & infrastructure2027 road improvement preliminary estimate$460kFY 2027
- Amount
- $460,000 USD
- Fiscal year
- 2027
- Category
- estimate
- Fund / bucket
- 2027 road improvements
Context: City Engineer's preliminary 2027 road improvement cost estimate.
Council vote · Passed
MOTION BY COUNCIL MEMBER RAINVILLE, SECONDED BY COUNCIL MEMBER BREYEN, TO RECEIVE AND FILE THE 2025, 2026, AND 2027 ROAD IMPROVEMENTS RECOMMENDATIONS, AND DIRECT STAFF TO KEEP THEM ON THE DOCKET FOR WHEN THEY BEGIN CONSIDERATION OF ROAD PROJECTS IN 2025.
moved by Rainville, seconded by Breyen
Evidence
From the Tuesday, November 12, 2024 Meeting City Council Meeting.
Roads & infrastructureF14$452kFY 2025
- Amount
- $451,720 USD
- Fiscal year
- 2025
- Category
- debt service
- Fund / bucket
- GO bonds/equipment bonds total budget
Context: 2025 budget total for listed road improvement and equipment bond lines in the example summary budget comparison.
No council approval is on record yet.
Evidence
From the Thursday, June 5, 2025 Meeting City Council Work Session.
Roads & infrastructureF1$450kFY ?
- Amount
- $450,000 USD
- Fiscal year
- unknown
- Category
- estimate
- Fund / bucket
- Roads & infrastructure
Context: Trail paving cost estimate discussed for the Lake George Regional Park plan.
Council vote · Passed
MOTION MADE BY COUNCIL MAYOR ROLF TO ADOPT RESOLUTION 2025-114 SUPPORTING THE LAKE GEORGE REGIONAL PARK LONG RANGE PLAN AND TO INCLUDE THE REQUEST FROM THE COUNCIL TO PRIORIZE THE TRAIL CONNECTION. SECOND BY COUNCIL MEMBER WYLIE. MOTION CARRIED (4-1 WEST).
moved by Rolf, seconded by Wylie
Evidence
From the Monday, September 8, 2025 Oak Grove City Council — 2025-09-08.
Roads & infrastructureF1$448kFY 2021
- Amount
- $447,500 USD
- Fiscal year
- 2021
- Category
- estimate
- Fund / bucket
- Ebony & Garnet Streets total estimated project cost
Context: Total estimated cost for the Ebony & Garnet Streets road improvement project, including proposed city-paid culvert replacements, subbase work, and additional aggregate base.
No council approval is on record yet.
Evidence
From the Wednesday, December 9, 2020 Meeting City Council Public Hearing.
Roads & infrastructureProposed 2022 Public Works budget$439kFY 2022
- Amount
- $439,410 USD
- Fiscal year
- 2022
- Category
- budget
- Fund / bucket
- Public Works
Context: Proposed 2022 Public Works budget.
No council approval is on record yet.
Evidence
From the Tuesday, July 20, 2021 Meeting City Council Work Session.
Roads & infrastructureF1$428kFY 2026
- Amount
- $427,598.1 USD
- Fiscal year
- 2026
- Category
- contract
- Fund / bucket
- 2026 Overlay Project
Context: Email summarizing 2026 Overlay Bid Results: “The lowest bidder is Capital Paving, with a total bid of $427,598.10 including the Jasper Street Alternate Bid.”
No council approval is on record yet.
Evidence
From the Tuesday, June 2, 2026 City Council Meeting - 2026 Overlay Public Hearing.
Roads & infrastructureOverlay capital paving base plus alternate contract$428kFY 2026
- Amount
- $427,589.1 USD
- Fiscal year
- 2026
- Category
- contract
- Fund / bucket
- Capital Paving base bid plus alternate
Context: Draft resolution states Capital Paving was the lowest responsible bidder for the base bid plus alternate and would be awarded the contract at this amount.
No council approval is on record yet.
From the Thursday, June 11, 2026 City Council Meeting.
Roads & infrastructureF7$428kFY 2026
- Amount
- $427,589.1 USD
- Fiscal year
- 2026
- Category
- contract
- Fund / bucket
- 2026 Overlay Project
Context: Bid tabulation: Total Schedule “A” + Schedule “B” + Schedule “C” (Base Bid + Alternate) (Capital Paving). Note: differs by $9.00 from email’s $427,598.10.
No council approval is on record yet.
Evidence
From the Tuesday, June 2, 2026 City Council Meeting - 2026 Overlay Public Hearing.
Roads & infrastructureFIN-004 Sun Land Acres project sheet$416kFY 2025
- Amount
- $416,000 USD
- Fiscal year
- 2025
- Category
- capital project
- Fund / bucket
- Road improvement fund
Context: Full-depth reclamation and paving of Sun Land Acres 2nd Addition: Tiger St NW.
No council approval is on record yet.
Evidence
From the Monday, May 6, 2024 Meeting City Council Work Session.
Roads & infrastructureFY2022 public works budget$409kFY 2022
- Amount
- $409,410 USD
- Fiscal year
- 2022
- Category
- budget
- Fund / bucket
- Public Works
Context: Proposed 2022 public works budget.
No council approval is on record yet.
Evidence
From the Monday, September 13, 2021 Meeting City Council Work Session.
Roads & infrastructureF19$400kFY ?
- Amount
- $400,000 USD
- Fiscal year
- unknown
- Category
- estimate
- Fund / bucket
- Old Viking Blvd earlier road-study estimate
Context: Mayor Pilon cited an earlier road-study estimate for Old Viking Blvd.
No council approval is on record yet.
Evidence
From the Tuesday, May 14, 2019 Meeting City Council Public Hearing.
Roads & infrastructureF6$391kFY 2026
- Amount
- $390,645.77 USD
- Fiscal year
- 2026
- Category
- contract
- Fund / bucket
- 2026 Overlay Project
Context: Bid tabulation: Total Schedule “A” + Schedule “B” (Base Bid) (Capital Paving).
No council approval is on record yet.
Evidence
From the Tuesday, June 2, 2026 City Council Meeting - 2026 Overlay Public Hearing.
Roads & infrastructureAudit 2022 public works$382kFY 2022
- Amount
- $382,138 USD
- Fiscal year
- 2022
- Category
- expenditure
- Fund / bucket
- General Fund public works
Context: 2022 General Fund actual public works expenditures in the audit presentation.
No council approval is on record yet.
Evidence
From the Tuesday, July 11, 2023 Meeting City Council Meeting.
Roads & infrastructure2025 street improvements budget$380kFY 2025
- Amount
- $380,400 USD
- Fiscal year
- 2025
- Category
- capital project
- Fund / bucket
- Road Improvement Fund - Street improvements
Context: Road improvement budget line item for street improvements.
Council vote · Passed
MOTION BY CM BREYEN, SECONDED BY CM RAINVILLE, TO APPROVE 2025 BUDGET.
moved by Breyen, seconded by Rainville
From the Tuesday, December 10, 2024 Meeting City Council Meeting.
Roads & infrastructureFIN-006 Ford Brook Estates project sheet$373kFY 2025
- Amount
- $373,000 USD
- Fiscal year
- 2025
- Category
- capital project
- Fund / bucket
- Road improvement fund
Context: Reconstruction or paving work for Ford Brook Estate 2nd addition: Erkium St. NW, to be completed with the City of Ramsey.
No council approval is on record yet.
Evidence
From the Monday, May 6, 2024 Meeting City Council Work Session.
Roads & infrastructureOMG Midwest Inc. dba Minnesota Paving and Materials bid$362kFY 2025
- Amount
- $361,583 USD
- Fiscal year
- 2025
- Category
- estimate
- Fund / bucket
- 2025 Overlay Project bids
Context: Bid received from OMG Midwest Inc. dba Minnesota Paving and Materials; not the bid accepted in the packet resolution.
No council approval is on record yet.
Evidence
From the Tuesday, June 17, 2025 City Council Meeting.
Roads & infrastructureFF-2$354kFY 2020
- Amount
- $353,800 USD
- Fiscal year
- 2020
- Category
- estimate
- Fund / bucket
- Road improvements (proposed)
Context: Preliminary estimate for proposed 2020 road improvement to 189th Lane, 190th Lane & Dolomite Street.
No council approval is on record yet.
Evidence
From the Thursday, February 13, 2020 Meeting City Council Public Hearing.
Roads & infrastructureF1$350kFY 2022
- Amount
- $350,000 USD
- Fiscal year
- 2022
- Category
- estimate
- Fund / bucket
- 2022 paving assessment improvement project
Context: Estimated cost of the 2022 paving assessment improvement project (properties on gravel portions of listed streets).
Council vote · Passed
MOTION MADE BY COUNCIL MEMBER WEST, SECOND BY COUNCIL MEMBER WYLIE TO ADOPT RESOLUTION 22-134 DECLARING COST TO BE ASSESSED, ORDERING PREPARATION OF PROPOSED ASSESSMENT AND CALLING FOR A PUBLIC HEARING IN THE MATTER OF THE 2022 PAVING ASSESSMENT IMPROVEMENT PROJECT.
moved by WEST, seconded by WYLIE
Evidence
From the Monday, September 12, 2022 Oak Grove City Council — 2022-09-12.
Roads & infrastructureAsphalt Surface Tech. Corp. bid$343kFY 2025
- Amount
- $343,423.6 USD
- Fiscal year
- 2025
- Category
- estimate
- Fund / bucket
- 2025 Overlay Project bids
Context: Bid received from Asphalt Surface Tech. Corp.; not the bid accepted in the packet resolution.
No council approval is on record yet.
Evidence
From the Tuesday, June 17, 2025 City Council Meeting.
Roads & infrastructureF5$341kFY ?
- Amount
- $341,000 USD
- Fiscal year
- unknown
- Category
- estimate
- Fund / bucket
- Five-year road improvement plan funding discussion
Context: Average amount per year stated as needed in the Road Improvement Fund to cover the proposed five-year road plan (discussion figure).
No council approval is on record yet.
Evidence
From the Thursday, November 9, 2017 City Council Workshop.
Roads & infrastructureF23$333kFY 2024
- Amount
- $332,900 USD
- Fiscal year
- 2024
- Category
- capital project
- Fund / bucket
- New Sterling plow truck
Context: Anticipated cost for a new Sterling truck for plowing.
Council vote · Passed
approval of 20 22371 adopting the final LEL for 2024 and approval of resolution 20272 adopting the budget
moved by R, seconded by counc Bryan
Evidence
From the Tuesday, December 12, 2023 Meeting City Council Public Hearing.
Roads & infrastructureFIN-005 Burns Country Estates project sheet$331kFY 2025
- Amount
- $331,000 USD
- Fiscal year
- 2025
- Category
- capital project
- Fund / bucket
- Road improvement fund
Context: Full-depth reclamation and paving of Burns Country Estates: 194th Ln NW.
No council approval is on record yet.
Evidence
From the Monday, May 6, 2024 Meeting City Council Work Session.
Roads & infrastructure2020 CIP map estimate $330k$330kFY 2020
- Amount
- $330,000 USD
- Fiscal year
- 2020
- Category
- estimate
- Fund / bucket
- 2020 CIP recommendation map
Context: Estimated road project cost shown on the 2020 CIP recommendation map.
No council approval is on record yet.
Evidence
From the Tuesday, August 13, 2019 Meeting City Council Meeting.
Roads & infrastructureF3$328kFY 2026
- Amount
- $328,386.8 USD
- Fiscal year
- 2026
- Category
- contract
- Fund / bucket
- 2026 Overlay Project
Context: Bid tabulation: Total Schedule “A” Base Bid (Capital Paving) for Overlay Project.
No council approval is on record yet.
Evidence
From the Tuesday, June 2, 2026 City Council Meeting - 2026 Overlay Public Hearing.
Roads & infrastructureFIN-009 Peterson's Pond View Estates project sheet$325kFY 2026
- Amount
- $325,200 USD
- Fiscal year
- 2026
- Category
- capital project
- Fund / bucket
- Road improvement fund
Context: Full-depth reclamation and paving of Peterson's Pond View Estates: 189th Ln NW.
No council approval is on record yet.
Evidence
From the Monday, May 6, 2024 Meeting City Council Work Session.
Roads & infrastructureF001$325kFY ?
- Amount
- $325,000 USD
- Fiscal year
- unknown
- Category
- estimate
- Fund / bucket
- Mackenzie Hills shared driveway/road construction estimate
Context: Staff reported that the estimated cost of meeting interim driveway/right-of-way construction requirements was over $325,000, excluding individual home driveways.
No council approval is on record yet.
Evidence
From the Tuesday, November 28, 2023 Meeting Planning and Zoning Commission Meeting.
Roads & infrastructure2020 CIP map estimate $300k$300kFY 2020
- Amount
- $300,000 USD
- Fiscal year
- 2020
- Category
- estimate
- Fund / bucket
- 2020 CIP recommendation map
Context: Estimated road project cost shown on the 2020 CIP recommendation map.
No council approval is on record yet.
Evidence
From the Tuesday, August 13, 2019 Meeting City Council Meeting.
Roads & infrastructureFF-4$296kFY 2020
- Amount
- $296,000 USD
- Fiscal year
- 2020
- Category
- estimate
- Fund / bucket
- Road improvements (proposed)
Context: Preliminary estimate for proposed 2020 road improvement to Ebony Street and Garnet Street (Willow Creek).
No council approval is on record yet.
From the Thursday, February 13, 2020 Meeting City Council Public Hearing.
Roads & infrastructureFIN-008 Engren's Addition project sheet$293kFY 2026
- Amount
- $293,200 USD
- Fiscal year
- 2026
- Category
- capital project
- Fund / bucket
- Road improvement fund
Context: Full-depth reclamation and paving of Engren's Addition: Lithium St NW.
No council approval is on record yet.
Evidence
From the Monday, May 6, 2024 Meeting City Council Work Session.
Roads & infrastructureF2$291kFY 2024
- Amount
- $291,325.76 USD
- Fiscal year
- 2024
- Category
- expenditure
- Fund / bucket
- Roads & infrastructure
Context: Payment to North Valley for 2024 Road Improvement Projects (Pay Request #1; Resolution 24-065).
Council vote · Passed
MOTION MADE BY COUNCIL MEMBER WEST TO APPROVE RESOLUTION 24-065 AUTHORIZING PAYMENT TO NORTH VALLEY IN THE AMOUNT OF $291,325.76.
moved by WEST, seconded by BRAY JOHNSON
From the Monday, June 10, 2024 Oak Grove City Council — 2024-06-10.
Roads & infrastructureRogers lake total assessed$290kFY 2021
- Amount
- $290,200 USD
- Fiscal year
- 2021
- Category
- assessment
- Fund / bucket
- Rogers Lake assessed project cost
Context: Total project cost assessed to benefitting properties for the Rogers Lake Area Road Project.
Council vote · Passed
MOTION BY GREENBERG TO APPROVE RESOLUTION 2021-32 CERTIFYING THE ASSESSMENT FOR ROGERS LAKE AREA ROAD PROJECT FOR $5,300 PER PARCEL FOR 52 PARCELS AND $7,300 PER PARCEL FOR THE 2 PARCLS ON 185TH AVE NW, WITH CLARIFICATION FROM ENGINEER REGARDING $199,092 FOR CULVERT REPLACEMENT AND BASE PREPARATION COSTS; 2ND BY BLAKE. ALL IN FAVOR. MOTION CARRIED.
moved by GREENBERG, seconded by BLAKE
Evidence
From the Tuesday, October 12, 2021 Meeting City Council Meeting.
Roads & infrastructureCommercial Park road work$285kFY 2023
- Amount
- $285,000 USD
- Fiscal year
- 2023
- Category
- capital project
- Fund / bucket
- Commercial Park
Context: Proposed 2023 road improvement project line item.
No council approval is on record yet.
Evidence
From the Monday, August 29, 2022 Meeting City Council Work Session.
Roads & infrastructureCommercial park road project$285kFY 2023
- Amount
- $285,000 USD
- Fiscal year
- 2023
- Category
- capital project
- Fund / bucket
- Commercial Park
Context: Road improvement fund project amount listed for Commercial Park.
No council approval is on record yet.
Evidence
From the Monday, July 25, 2022 Meeting City Council Work Session.
Roads & infrastructureFIN-007 Shiloh Creek project sheet$279kFY 2026
- Amount
- $279,400 USD
- Fiscal year
- 2026
- Category
- capital project
- Fund / bucket
- Road improvement fund
Context: Full-depth reclamation and paving of Shiloh Creek: Krypton St NW.
No council approval is on record yet.
Evidence
From the Monday, May 6, 2024 Meeting City Council Work Session.
Roads & infrastructureFIN-010 Prairie Brook Estates project sheet$279kFY 2027
- Amount
- $279,000 USD
- Fiscal year
- 2027
- Category
- capital project
- Fund / bucket
- Road improvement fund
Context: Full-depth reclamation and paving of Prairie Brook Estates: 218th Ave NW.
No council approval is on record yet.
Evidence
From the Monday, May 6, 2024 Meeting City Council Work Session.
Roads & infrastructureF7$268kFY ?
- Amount
- $267,910 USD
- Fiscal year
- unknown
- Category
- estimate
- Fund / bucket
- Old Viking Blvd
Context: Proposed total estimated cost to be paid by the City for Old Viking Blvd project (50% of total).
No council approval is on record yet.
Evidence
From the Tuesday, January 16, 2018 City Council Meeting.
Roads & infrastructureF6$268kFY ?
- Amount
- $267,910 USD
- Fiscal year
- unknown
- Category
- assessment
- Fund / bucket
- Old Viking Blvd
Context: Proposed total estimated cost to be assessed to benefiting properties for Old Viking Blvd project (50% of total).
No council approval is on record yet.
Evidence
From the Tuesday, January 16, 2018 City Council Meeting.
Roads & infrastructureNorth Valley 2019 Road Improvement Project claim$256kFY 2019
- Amount
- $255,842.85 USD
- Fiscal year
- 2019
- Category
- invoice
- Fund / bucket
- North Valley Inc. claim #1508
Context: Road Improvement Project 2019 claim and contractor payment application amount due.
Council vote · Passed
MOTION TO APPROVE TONIGHT'S CONSENT AGENDA AS PROVIDED BY RAINVILLE, SECONDED BY GREENBERG; ALL IN FAVOR, MOTION CARRIES.
moved by RAINVILLE, seconded by GREENBERG
From the Tuesday, August 13, 2019 Meeting City Council Meeting.
Roads & infrastructureF2$250kFY ?
- Amount
- $250,000 USD
- Fiscal year
- unknown
- Category
- budget
- Fund / bucket
- Road improvements
Context: City Engineer previously told Council a minimum of $250,000 per year would be needed for road improvements (discussed, not adopted here).
No council approval is on record yet.
Evidence
From the Monday, September 18, 2017 City Council Budget Meeting.
Roads & infrastructureFF-1$244kFY 2020
- Amount
- $243,600 USD
- Fiscal year
- 2020
- Category
- estimate
- Fund / bucket
- Road improvements (proposed)
Context: Preliminary estimate for proposed 2020 road improvement to Krypton Street, 183rd Avenue, Merle's Lane & Potassium Street.
No council approval is on record yet.
Evidence
From the Thursday, February 13, 2020 Meeting City Council Public Hearing.
Roads & infrastructureFf 32$200kFY 2024
- Amount
- $200,000 USD
- Fiscal year
- 2024
- Category
- capital project
- Fund / bucket
- Public Works storage building CIP budget
Context: Budgeted amount on the CIP for a 42' x 96' commercial storage building at Public Works.
No council approval is on record yet.
From the Monday, February 26, 2024 Oak Grove City Council — 2024-02-26.
Roads & infrastructure2020 CIP map estimate $200k$200kFY 2020
- Amount
- $200,000 USD
- Fiscal year
- 2020
- Category
- estimate
- Fund / bucket
- 2020 CIP recommendation map
Context: Estimated road project cost shown on the 2020 CIP recommendation map.
No council approval is on record yet.
Evidence
From the Tuesday, August 13, 2019 Meeting City Council Meeting.
Roads & infrastructureF1$200kFY ?
- Amount
- $200,000 USD
- Fiscal year
- unknown
- Category
- transfer
- Fund / bucket
- Road Improvement Fund
Context: Transfer from General Fund into Road Improvement Fund (discussed as part of road funding percentage question).
No council approval is on record yet.
Evidence
From the Thursday, April 5, 2018 City Council Workshop.
Roads & infrastructureF3$200kFY 2018
- Amount
- $200,000 USD
- Fiscal year
- 2018
- Category
- budget
- Fund / bucket
- Road Improvement Fund
Context: Suggested Road Improvement Fund level discussed as part of 2018 proposed budget.
No council approval is on record yet.
Evidence
From the Monday, September 18, 2017 City Council Budget Meeting.
Roads & infrastructureJasper Street estimated assessments$195kFY 2019
- Amount
- $195,480 USD
- Fiscal year
- 2019
- Category
- assessment
- Fund / bucket
- Jasper Street feasibility study
Context: Estimated amount to be assessed to benefiting properties for the Jasper Street project.
No council approval is on record yet.
Evidence
From the Tuesday, June 11, 2019 Meeting City Council Meeting.
Roads & infrastructure2022 Microsurfacing Project payment$175kFY 2022
- Amount
- $175,317.93 USD
- Fiscal year
- 2022
- Category
- capital project
- Fund / bucket
- October Claims major line items
Context: 2022 Microsurfacing Project payment to Asphalt Surface Technologies.
Council vote · Passed
MOTION BY COUNCIL MEMBER BLAKE, SECONDED BY GREENBERG TO ACCEPT THE CONSENT AGENDA AS PRESENTED.
moved by Blake, seconded by Greenberg
Evidence
From the Thursday, November 10, 2022 Meeting City Council Meeting.
Roads & infrastructureF4$173kFY ?
- Amount
- $173,000 USD
- Fiscal year
- unknown
- Category
- estimate
- Fund / bucket
- Roads & infrastructure
Context: Public Works storage building quote discussed: 42x96 pole building with a concrete floor estimated at $173,000.
No council approval is on record yet.
Evidence
From the Monday, August 29, 2022 Oak Grove City Council Work Session — 2022-08-29.
Roads & infrastructureF-4$168kFY ?
- Amount
- $167,500 USD
- Fiscal year
- unknown
- Category
- estimate
- Fund / bucket
- Old Viking Blvd Bridge
Context: Estimated total project cost for the Old Viking Blvd Bridge replacement project.
No council approval is on record yet.
Evidence
From the Tuesday, January 10, 2012 City Council Meeting.
Roads & infrastructureF23$161kFY 2019
- Amount
- $160,500 USD
- Fiscal year
- 2019
- Category
- expenditure
- Fund / bucket
- 189th, 190th and Dolomite city share
Context: Estimated amount to be paid by the City for the 189th Lane, 190th Lane and Dolomite Street project.
No council approval is on record yet.
Evidence
From the Tuesday, January 14, 2020 Meeting City Council Public Hearing and Special Meeting.
Roads & infrastructureF22$161kFY 2019
- Amount
- $160,500 USD
- Fiscal year
- 2019
- Category
- assessment
- Fund / bucket
- 189th, 190th and Dolomite assessed share
Context: Estimated amount to be assessed to benefitting properties for the 189th Lane, 190th Lane and Dolomite Street project.
No council approval is on record yet.
Evidence
From the Tuesday, January 14, 2020 Meeting City Council Public Hearing and Special Meeting.
Roads & infrastructureRogers Lake Road proposed assessment total$156kFY 2024
- Amount
- $156,000 USD
- Fiscal year
- 2024
- Category
- assessment
- Fund / bucket
- Rogers Lake Road proposed assessment total
Context: Proposed total assessment cited in assessment-hearing notice for the road project for which council declined to offer a deferment policy.
Council vote · Passed
MOTION BY COUNCIL MEMBER RAINVILLE, SECONDED BY BREYEN TO AGREE WITH ATTORNEY AND DO NOT OFFER A DEFERMENT POLICY ON THE ROGERS LAKE ROAD PROJECT.
moved by Rainville, seconded by Breyen
Evidence
From the Tuesday, June 11, 2024 Meeting City Council Meeting.
Roads & infrastructurePublic Works under-budget source$150kFY 2024
- Amount
- $150,000 USD
- Fiscal year
- 2024
- Category
- budget
- Fund / bucket
- 2024 budget amendment source
Context: Approximate Public Works underspending identified as a source for the proposed budget amendment.
Council vote · Tabled
MOTION BY CM BREYEN SECONDED BY MAYOR HYBBEN TO TABLE AMENDING THE 2024 BUDGET TO THE NEXT MEETING. VIA ROLL CALL: 4 AYES, MOTION CARRIED.
moved by Breyen, seconded by Hybben
Evidence
From the Tuesday, February 11, 2025 Meeting Council Meeting.
Roads & infrastructureRoad improvement fund amount before work-session reduction$150kFY 2025
- Amount
- $150,000 USD
- Fiscal year
- 2025
- Category
- capital project
- Fund / bucket
- Road improvement fund reduction discussion
Context: The minutes record a council decision to reduce $150,000 in the road improvement fund to $100,000 for 2025.
No council approval is on record yet.
Evidence
From the Monday, July 29, 2024 Meeting City Council Work Session.
Roads & infrastructureF10$150kFY 2024
- Amount
- $150,000 USD
- Fiscal year
- 2024
- Category
- capital project
- Fund / bucket
- Road project budget
Context: Council questioned whether the road project amount would pay for a PACER study and what the remaining funds were for.
No council approval is on record yet.
Evidence
From the Thursday, September 14, 2023 Meeting City Council Work Session.
Roads & infrastructureF8$150kFY ?
- Amount
- $150,000 USD
- Fiscal year
- unknown
- Category
- budget
- Fund / bucket
- road_improvement
Context: Stated amount discussed as being in the road improvement fund/plan at a prior meeting; mentioned during discussion of funding Old Viking.
No council approval is on record yet.
Evidence
From the Tuesday, February 21, 2017 City of Nowthen Road & Bridge Meeting.
Roads & infrastructureF15$149kFY 2018
- Amount
- $149,000 USD
- Fiscal year
- 2018
- Category
- estimate
- Fund / bucket
- Pinnaker Lake Estates road improvement
Context: Engineer estimate for Pinnaker Lake Estates Road Project total cost referenced in Resolution 2018-12.
Council vote · Passed
Bettinger made a motion to approve the plans and specs and to Adopt Resolution 2018-12; Reighard seconded. All in favor; motion carried.
moved by Bettinger, seconded by Reighard
Evidence
From the Tuesday, May 8, 2018 City Council Meeting.
Roads & infrastructureF8$147kFY ?
- Amount
- $146,500 USD
- Fiscal year
- unknown
- Category
- estimate
- Fund / bucket
- feasibility_estimate
Context: Pinnaker Lake Estates road project estimated total cost in feasibility report (packet).
Council vote · Passed
Breyen made a motion to adopt Resolution 2018-04 and to schedule the Public Improvement Hearing for March 20, 2018 at 7:00 PM; Bettinger seconded. All in favor; motion carried.
moved by Breyen, seconded by Bettinger
From the Tuesday, February 13, 2018 City Council Meeting.
Roads & infrastructureF1$147kFY 2018
- Amount
- $146,500 USD
- Fiscal year
- 2018
- Category
- estimate
- Fund / bucket
- Pinnaker Lake Estates
Context: Pinnaker Lake Estates road project total estimated cost.
No council approval is on record yet.
Evidence
From the Tuesday, January 16, 2018 City Council Meeting.
Roads & infrastructureWestpahl Country Acres road work$145kFY 2023
- Amount
- $145,250 USD
- Fiscal year
- 2023
- Category
- capital project
- Fund / bucket
- Westpahl Country Acres
Context: Proposed 2023 road improvement project line item.
No council approval is on record yet.
Evidence
From the Monday, August 29, 2022 Meeting City Council Work Session.
Roads & infrastructureF-6$145kFY ?
- Amount
- $145,000 USD
- Fiscal year
- unknown
- Category
- estimate
- Fund / bucket
- Old Viking Blvd Bridge
Context: Engineer's estimate for Old Viking Blvd Bridge project.
No council approval is on record yet.
Evidence
From the Tuesday, October 9, 2012 Public Hearing & City Council Meeting.
Roads & infrastructureFf 33$140kFY 2024
- Amount
- $140,476 USD
- Fiscal year
- 2024
- Category
- contract
- Fund / bucket
- Public Works storage building - building package
Context: Walters Buildings proposal total building package price for the Public Works storage building.
No council approval is on record yet.
Evidence
From the Monday, February 26, 2024 Oak Grove City Council — 2024-02-26.
Roads & infrastructureEbony garnet total assessed$140kFY 2021
- Amount
- $140,000 USD
- Fiscal year
- 2021
- Category
- assessment
- Fund / bucket
- Ebony & Garnet assessed project cost
Context: Total project cost assessed to benefitting properties for the Ebony & Garnet Road Project.
Council vote · Passed
MOTION BY GREENBERG TO APPROVE RESOLUTION 2021-31 CERTIFYING THE ASSESSMENT FOR EBONY AND GARNET ROAD PROJECT FOR $7,000 PER PARCEL, WITH CLARIFICATION FROM ENGINEER REGARDING $127,303 FOR BASE CORRECTION COSTS; 2ND BY RAINVILLE. ALL IN FAVOR. MOTION CARRIED
moved by GREENBERG, seconded by RAINVILLE
Evidence
From the Tuesday, October 12, 2021 Meeting City Council Meeting.
Roads & infrastructureProposed expenditure budget adjustment$137kFY 2024
- Amount
- $137,000 USD
- Fiscal year
- 2024
- Category
- budget
- Fund / bucket
- 2024 budget amendment expenditures
Context: Proposed expenditure budget adjustment offset by revenue and Public Works underspending; proposed amendment was tabled.
Council vote · Tabled
MOTION BY CM BREYEN SECONDED BY MAYOR HYBBEN TO TABLE AMENDING THE 2024 BUDGET TO THE NEXT MEETING. VIA ROLL CALL: 4 AYES, MOTION CARRIED.
moved by Breyen, seconded by Hybben
Evidence
From the Tuesday, February 11, 2025 Meeting Council Meeting.
Roads & infrastructureF4$136kFY 2019
- Amount
- $136,000 USD
- Fiscal year
- 2019
- Category
- estimate
- Fund / bucket
- Halas St NW
Context: Agenda preliminary estimate for the proposed 2019 road improvement to Halas St NW.
No council approval is on record yet.
Evidence
From the Tuesday, May 14, 2019 Meeting City Council Public Hearing.
Roads & infrastructureF-1$136kFY 2019
- Amount
- $136,000 USD
- Fiscal year
- 2019
- Category
- estimate
- Fund / bucket
- Halas St. NW road improvement
Context: Preliminary estimate for the proposed 2019 Halas St. NW road improvement.
Council vote · Passed
Resolutions 2019-09, Ordering the Improvements for Halas St NW - Motion by Rainville, 2nd by Breyen.
moved by Rainville, seconded by Breyen
Evidence
From the Monday, January 14, 2019 Meeting City Council Public Hearing.
Roads & infrastructureRogers Lake engineering legal administrative$135kFY 2021
- Amount
- $135,000 USD
- Fiscal year
- 2021
- Category
- estimate
- Fund / bucket
- Rogers Lake Area engineering, legal and administrative
Context: Engineering, legal and administrative estimate for Rogers Lake Area project.
Council vote · Passed
MOTION BY RAINVILLE APPROVING PLANS AND SPECIFICATIONS, (INCLUDING 185TH LANE), AND ORDERING ADVERTISEMENT FOR BIDS FOR THE ROGER'S LAKE AREA
moved by Rainville, seconded by Blake
Evidence
From the Tuesday, April 13, 2021 Meeting City Council Meeting.
Roads & infrastructureF1$133kFY ?
- Amount
- $132,983.67 USD
- Fiscal year
- unknown
- Category
- expenditure
- Fund / bucket
- Ebony & Garnet Road Project
Context: Payment to North Valley for pre-project work completed for Ebony & Garnet Road Project.
Council vote · Passed
MOTION BY RAINVILLE TO AUTHORIZE PAYMENT OF $132,983.67 TO NORTH VALLEY FOR PRE-PROJECT WORK COMPLETED; SECONDED BY BLAKE. ROLL CALL VOTE - All in Favor. MOTION CARRIED.
moved by RAINVILLE, seconded by BLAKE
From the Tuesday, January 12, 2021 Meeting City Council Meeting.
Roads & infrastructureWaco area engineering legal administrative estimate$130kFY 2024
- Amount
- $130,000 USD
- Fiscal year
- 2024
- Category
- capital project
- Fund / bucket
- Waco area engineering legal administrative
Context: Engineering, legal, and administrative cost in preliminary estimate.
Council vote · Passed
MOTION BY COUNCIL MEMBER BREYEN, SECONDED BY FLADEBO TO APPROVE OF RESOLUTION 2023-XX RECEIVING FEASIBILITY REPORT AND CALLING FOR A PUBLIC HEARING ON IMPROVEMENTS.
moved by Breyen, seconded by Fladebo
Evidence
From the Tuesday, October 10, 2023 Meeting City Council Meeting.
Roads & infrastructureAdditional annual road improvement budget$120kFY 2027
- Amount
- $120,000 USD
- Fiscal year
- 2027
- Category
- capital project
- Fund / bucket
- Road Improvement
Context: Annual additional patching or overlay on city streets through 2030.
Council vote · Passed
Make a motion to adopt the 2027 CIP and ERP with direction to the city staff of investigating the feasibility of alternatively to the uh proposed well new well uh looking at using a farmer's irrigation well that has been offered to the city previously.
moved by Glaser, seconded by Hybben
Evidence
From the Tuesday, June 9, 2026 City Council Meeting.
Roads & infrastructure2023 Chevy Silverado truck and accessories$120kFY 2023
- Amount
- $120,000 USD
- Fiscal year
- 2023
- Category
- capital project
- Fund / bucket
- Equipment Replacement Fund
Context: Not-to-exceed authorization for a 2023 Chevy Silverado truck and accessories for Public Works.
Council vote · Passed
MOTION BY COUNCIL MEMBER FLADEBO, SECONDED BY BREYEN TO ACCEPT THE CONSENT AGENDA AS PRESENTED.
moved by Fladebo, seconded by Breyen
From the Tuesday, March 14, 2023 Meeting City Council Meeting.
Roads & infrastructure2023 Silverado truck purchase cap$120kFY 2023
- Amount
- $120,000 USD
- Fiscal year
- 2023
- Category
- capital project
- Fund / bucket
- 2023 Silverado truck amended cap
Context: Final not-to-exceed amount for the 2023 Silverado truck, needed accessories, and a new two-yard salter/sander.
Council vote · Passed
MOTION BY COUNCIL MEMBER BREYEN TO APPROVE ADMINISTRATOR LEHNER AND THE MAYOR TO MOVE FORWARD WITH THE PURCHASE OF THE 2023 SILVERADO TRUCK WITH ALL NEEDED ACCESSORIES, NOT TO EXCEED $110,000. COUNCIL MEMBER ALDERS OFFERED AN AMENDMENT TO THE MOTION TO NOT EXCEED $120,000 AND TO INCLUDE A NEW 2 YARD SALTER/SANDER AS WELL. COUNCIL MEMBER BREYEN ACCEPTED THE AMENDMENT TO HIS MOTION. COUNCIL MEMBER A
moved by Breyen, seconded by Alders
Evidence
From the Tuesday, February 14, 2023 Meeting City Council Meeting.
Roads & infrastructureF2$111kFY 2019
- Amount
- $111,360 USD
- Fiscal year
- 2019
- Category
- capital project
- Fund / bucket
- Halas Street estimated construction cost
Context: Estimated construction cost schedule A for the Halas Street project.
No council approval is on record yet.
Evidence
From the Tuesday, January 14, 2020 Meeting City Council Public Hearing and Special Meeting.
Roads & infrastructureF-5$110kFY ?
- Amount
- $109,601.2 USD
- Fiscal year
- unknown
- Category
- estimate
- Fund / bucket
- Old Viking Blvd Bridge
Context: Lowest bid reported for Old Viking Blvd Bridge project.
No council approval is on record yet.
Evidence
From the Tuesday, October 9, 2012 Public Hearing & City Council Meeting.
Roads & infrastructureTwin Lakes Park parking lot work$100kFY 2027
- Amount
- $100,000 USD
- Fiscal year
- 2027
- Category
- capital project
- Fund / bucket
- Park Capital
Context: Twin Lakes Park parking lots and drive patch, seal coat and restriping.
Council vote · Passed
Make a motion to adopt the 2027 CIP and ERP with direction to the city staff of investigating the feasibility of alternatively to the uh proposed well new well uh looking at using a farmer's irrigation well that has been offered to the city previously.
moved by Glaser, seconded by Hybben
Evidence
From the Tuesday, June 9, 2026 City Council Meeting.
Roads & infrastructureTwin Lakes Park parking lot work$100kFY 2027
- Amount
- $100,000 USD
- Fiscal year
- 2027
- Category
- capital project
- Fund / bucket
- Park Capital
Context: 2027 Twin Lakes Park parking lot and drive patch, seal coat, and restriping line item.
No council approval is on record yet.
From the Thursday, May 28, 2026 City Council Worksession.
Roads & infrastructurePark Improvement - Twin Lakes parking lot$100kFY 2027
- Amount
- $100,000 USD
- Fiscal year
- 2027
- Category
- capital project
- Fund / bucket
- Parks
Context: Patch, seal coat and re-stripe parking lots and drive for Twin Lakes park.
No council approval is on record yet.
Evidence
From the Tuesday, May 19, 2026 City Council Meeting.
Roads & infrastructureTwin lakes parking lot$100kFY 2027
- Amount
- $100,000 USD
- Fiscal year
- 2027
- Category
- capital project
- Fund / bucket
- Park Capital
Context: Twin Lakes Park parking lot and drive patch, seal coat, and re-striping.
No council approval is on record yet.
Evidence
From the Tuesday, May 19, 2026 City Council Worksession.
Roads & infrastructure2025 street maintenance budget$100kFY 2025
- Amount
- $100,000 USD
- Fiscal year
- 2025
- Category
- capital project
- Fund / bucket
- Road Improvement Fund - Street maintenance
Context: Road improvement budget line item for street maintenance.
Council vote · Passed
MOTION BY CM BREYEN, SECONDED BY CM RAINVILLE, TO APPROVE 2025 BUDGET.
moved by Breyen, seconded by Rainville
From the Tuesday, December 10, 2024 Meeting City Council Meeting.
Roads & infrastructureRoad improvement fund amount after work-session reduction$100kFY 2025
- Amount
- $100,000 USD
- Fiscal year
- 2025
- Category
- capital project
- Fund / bucket
- Road improvement fund reduction discussion
Context: The minutes record a council decision to reduce the road improvement fund amount to $100,000 for 2025.
No council approval is on record yet.
Evidence
From the Monday, July 29, 2024 Meeting City Council Work Session.
Roads & infrastructureFIN-002 Cold Storage Building project sheet$100kFY 2028
- Amount
- $100,000 USD
- Fiscal year
- 2028
- Category
- capital project
- Fund / bucket
- Capital improvement fund
Context: Cold storage building for public works, shown on the individual project sheet for 2028.
No council approval is on record yet.
Evidence
From the Monday, May 6, 2024 Meeting City Council Work Session.
Roads & infrastructureF5$100kFY ?
- Amount
- $100,000 USD
- Fiscal year
- unknown
- Category
- transfer
- Fund / bucket
- Roads & infrastructure
Context: Public works asset acquisition fund balance discussion referenced a $100,000 transfer in.
No council approval is on record yet.
Evidence
From the Monday, August 29, 2022 Oak Grove City Council Work Session — 2022-08-29.
Roads & infrastructure2020 CIP map estimate $100k$100kFY 2020
- Amount
- $100,000 USD
- Fiscal year
- 2020
- Category
- estimate
- Fund / bucket
- 2020 CIP recommendation map
Context: Estimated road project cost shown on the 2020 CIP recommendation map.
No council approval is on record yet.
Evidence
From the Tuesday, August 13, 2019 Meeting City Council Meeting.
Roads & infrastructureF9$100kFY ?
- Amount
- $100,000 USD
- Fiscal year
- unknown
- Category
- budget
- Fund / bucket
- road_improvement
Context: Stated annual amount in the road improvement plan.
No council approval is on record yet.
Evidence
From the Tuesday, February 21, 2017 City of Nowthen Road & Bridge Meeting.
Roads & infrastructureF1$98kFY ?
- Amount
- $98,000 USD
- Fiscal year
- unknown
- Category
- salary
- Fund / bucket
- Roads & infrastructure
Context: Administrator Wickham recommended increasing Director Anderson's pay to $98,000/annually in connection with the market rate adjustment for the Public Works Director (Resolution 22-180).
Council vote · Passed
MOTION MADE BY MAYOR DENNO, SECOND BY COUNCIL MEMBER WEST TO APPROVE I.
moved by DENNO, seconded by WEST
From the Monday, November 14, 2022 Oak Grove City Council — 2022-11-14.
Roads & infrastructureF1$98kFY 2019
- Amount
- $97,500 USD
- Fiscal year
- 2019
- Category
- estimate
- Fund / bucket
- Meadows of Verde Valley
Context: Agenda preliminary estimate for the proposed 2019 road improvement to Meadows of Verde Valley.
No council approval is on record yet.
Evidence
From the Tuesday, May 14, 2019 Meeting City Council Public Hearing.
Roads & infrastructureF-004$98kFY 2019
- Amount
- $97,500 USD
- Fiscal year
- 2019
- Category
- estimate
- Fund / bucket
- Meadows of Verde Valley road improvement
Context: Preliminary estimate for the proposed 2019 Meadows of Verde Valley road improvement.
Council vote · Passed
Resolution 2019-07, Ordering the Improvements for Meadows of Verde Valley
moved by Pilon, seconded by Rainville
Evidence
From the Thursday, January 10, 2019 Meeting City Council Public Hearing.
Roads & infrastructureXenon culvert one call rcp 95260$95kFY 2023
- Amount
- $95,260 USD
- Fiscal year
- 2023
- Category
- estimate
- Fund / bucket
- One-Call Contracting reinforced concrete pipe option
Context: Alternate reinforced concrete pipe option in the packet.
No council approval is on record yet.
Evidence
From the Tuesday, July 11, 2023 Meeting City Council Meeting.
Roads & infrastructureFIN-14$93kFY 2023
- Amount
- $93,000 USD
- Fiscal year
- 2023
- Category
- estimate
- Fund / bucket
- Xenon Street culvert replacement high estimate
Context: Staff said the Xenon Street culvert replacement costs ranged from $50,000 to $93,000 depending on culvert style.
No council approval is on record yet.
Evidence
From the Tuesday, May 9, 2023 Meeting City Council Meeting.
Roads & infrastructureF22$93kFY ?
- Amount
- $93,000 USD
- Fiscal year
- unknown
- Category
- transfer
- Fund / bucket
- Budget discussion (proposed transfers)
Context: Proposed transfer into Public Works from asset acquisition fund.
No council approval is on record yet.
Evidence
From the Monday, October 31, 2022 Oak Grove City Council — 2022-10-31.
Roads & infrastructureSun Land Acres, 2nd addition road work$93kFY 2023
- Amount
- $92,750 USD
- Fiscal year
- 2023
- Category
- capital project
- Fund / bucket
- Sun Land Acres, 2nd addition
Context: Proposed 2023 road improvement project line item.
No council approval is on record yet.
Evidence
From the Monday, August 29, 2022 Meeting City Council Work Session.
Roads & infrastructureF2$90kFY ?
- Amount
- $90,000 USD
- Fiscal year
- unknown
- Category
- estimate
- Fund / bucket
- Roads & infrastructure
Context: Estimated city portion of upcoming roundabout project at Viking Blvd NW and Rum River Blvd NW; described as reimbursable by State Aid funds.
No council approval is on record yet.
Evidence
From the Monday, February 27, 2023 Oak Grove City Council — 2023-02-27.
Roads & infrastructureF2$86kFY 2019
- Amount
- $86,100 USD
- Fiscal year
- 2019
- Category
- estimate
- Fund / bucket
- Garnet Street
Context: Agenda preliminary estimate for the proposed 2019 road improvement to Garnet Street.
No council approval is on record yet.
Evidence
From the Tuesday, May 14, 2019 Meeting City Council Public Hearing.
Roads & infrastructureF-008$86kFY 2019
- Amount
- $86,100 USD
- Fiscal year
- 2019
- Category
- estimate
- Fund / bucket
- Garnet Street road improvement
Context: Preliminary estimate for the proposed 2019 Garnet Street road improvement.
Council vote · Passed
Resolution 2019-08 Ordering the Improvements for Garnet St.
moved by Pilon, seconded by Blake
Evidence
From the Thursday, January 10, 2019 Meeting City Council Public Hearing.
Roads & infrastructureFY2022 public works materials and supplies$84kFY 2022
- Amount
- $84,400 USD
- Fiscal year
- 2022
- Category
- expenditure
- Fund / bucket
- Public Works
Context: Proposed 2022 public works materials and supplies.
No council approval is on record yet.
Evidence
From the Monday, September 13, 2021 Meeting City Council Work Session.
Roads & infrastructureKrypton Street estimated assessments$84kFY 2019
- Amount
- $84,140 USD
- Fiscal year
- 2019
- Category
- assessment
- Fund / bucket
- Krypton Street feasibility study
Context: Estimated amount to be assessed to benefiting properties for the Krypton Street project.
No council approval is on record yet.
Evidence
From the Tuesday, June 11, 2019 Meeting City Council Meeting.
Roads & infrastructureF4$82kFY ?
- Amount
- $81,750 USD
- Fiscal year
- unknown
- Category
- estimate
- Fund / bucket
- Road and Bridge
Context: Alternate quote (Diversified Paving) for Water Crest Street and Bison Street repairs included in the packet.
No council approval is on record yet.
Evidence
From the Wednesday, August 15, 2018 City Council Meeting.
Roads & infrastructureF3$78kFY 2019
- Amount
- $77,800 USD
- Fiscal year
- 2019
- Category
- estimate
- Fund / bucket
- Rolling Hills
Context: Agenda preliminary estimate for the proposed 2019 road improvement to Rolling Hills.
No council approval is on record yet.
Evidence
From the Tuesday, May 14, 2019 Meeting City Council Public Hearing.
Roads & infrastructureF-001$78kFY 2019
- Amount
- $77,800 USD
- Fiscal year
- 2019
- Category
- estimate
- Fund / bucket
- Rolling Hills road improvement
Context: Preliminary estimate for the proposed 2019 Rolling Hills road improvement in the minutes.
Council vote · Passed
Resolutions 2019-06, Ordering the Improvements for Rolling Hills
moved by Pilon, seconded by Breyen
Evidence
From the Thursday, January 10, 2019 Meeting City Council Public Hearing.
Roads & infrastructureJoe Glaze proposed 2025 salary$77kFY 2025
- Amount
- $77,480 USD
- Fiscal year
- 2025
- Category
- salary
- Fund / bucket
- Joe Glaze proposed salary
Context: 2025 proposed salary for Joe Glaze, Public Works Supervisor.
Council vote · Passed
MOTION BY CM BREYEN, SECONDED BY CM GLASER, TO APPROVE CONSENT AGENDA
moved by Breyen, seconded by Glaser
Evidence
From the Tuesday, January 14, 2025 Meeting City Council Meeting.
Roads & infrastructureF010$76kFY 2026
- Amount
- $75,819.88 USD
- Fiscal year
- 2026
- Category
- capital project
- Fund / bucket
- Baugh Street estimated city share
Context: The preliminary Anoka County joint powers agreement estimated the City's total share including construction and construction engineering.
No council approval is on record yet.
From the Tuesday, May 13, 2025 Meeting City Council Meeting.
Roads & infrastructurePark Improvement - Memorial Park parking lot$75kFY 2029
- Amount
- $75,000 USD
- Fiscal year
- 2029
- Category
- capital project
- Fund / bucket
- Parks
Context: Patch, seal coat and re-stripe parking lot and drive for Memorial Park.
No council approval is on record yet.
Evidence
From the Tuesday, May 19, 2026 City Council Meeting.
Roads & infrastructureF17$75kFY 2018
- Amount
- $74,500 USD
- Fiscal year
- 2018
- Category
- assessment
- Fund / bucket
- Pinnaker Lake Estates road improvement
Context: Assessed portion of Pinnaker Lake Estates Road Project declared in Resolution 2018-12.
Council vote · Passed
Bettinger made a motion to approve the plans and specs and to Adopt Resolution 2018-12; Reighard seconded. All in favor; motion carried.
moved by Bettinger, seconded by Reighard
Evidence
From the Tuesday, May 8, 2018 City Council Meeting.
Roads & infrastructureF16$75kFY 2018
- Amount
- $74,500 USD
- Fiscal year
- 2018
- Category
- capital project
- Fund / bucket
- Pinnaker Lake Estates road improvement
Context: City portion of Pinnaker Lake Estates Road Project cost declared in Resolution 2018-12.
Council vote · Passed
Bettinger made a motion to approve the plans and specs and to Adopt Resolution 2018-12; Reighard seconded. All in favor; motion carried.
moved by Bettinger, seconded by Reighard
Evidence
From the Tuesday, May 8, 2018 City Council Meeting.
Roads & infrastructureF3$73kFY 2026
- Amount
- $72,523.36 USD
- Fiscal year
- 2026
- Category
- capital project
- Fund / bucket
- Baugh Street JPA City cost cap
Context: City's capped share of Baugh Street reconstruction construction and engineering costs.
Council vote · Passed
MOTION BY COUNCIL MEMBER BREYEN, SECONDED BY COUNCIL MEMBER RAINVILLE TO APPROVE THE CONSENT AGENDA AS AMENDED.
moved by BREYEN, seconded by RAINVILLE
From the Tuesday, August 12, 2025 City Council Meeting.
Roads & infrastructureF3$73kFY 2026
- Amount
- $72,523.36 USD
- Fiscal year
- 2026
- Category
- contract
- Fund / bucket
- Baugh Street JPA city share
Context: Total estimated City share for the Baugh Street reconstruction JPA, including construction and construction engineering.
Council vote · Passed
MOTION BY CM BREYEN, SECONDED BY COUNCIL MEMBER GLASER, TO APPROVE THE JPA FOR THE BAUGH ST IMPROVEMENTS.
moved by Breyen, seconded by Glaser
From the Tuesday, July 8, 2025 City Council Meeting.
Roads & infrastructureF6$70kFY ?
- Amount
- $70,000 USD
- Fiscal year
- unknown
- Category
- capital project
- Fund / bucket
- Loader replacement authorization
Context: Council discussed whether the public works director would be authorized to spend up to $70,000 on a replacement loader.
No council approval is on record yet.
From the Thursday, September 7, 2017 City Council Workshop.
Roads & infrastructureF7$68kFY 2019
- Amount
- $68,000 USD
- Fiscal year
- 2019
- Category
- expenditure
- Fund / bucket
- Halas Street city share
Context: Estimated amount to be paid by the City for the Halas Street project.
No council approval is on record yet.
Evidence
From the Tuesday, January 14, 2020 Meeting City Council Public Hearing and Special Meeting.
- …and 323 more items in this department. Use the filters above to narrow.