Skip to main content

City of Nowthen · Money

Following the 2025 money through the record

This follows real 2025 dollars through the bids, contracts, and payments the council actually voted on. It is a trail, not a budget, grouped the way a resident would ask about the money, by road, piece of equipment, or vendor. Every figure links back to the meeting that proves it.

What you're looking at

Every payment, bid, contract, quote, and capital purchase the system could find in the 2025 meeting record. Itemized checks from the published claim registers sit alongside the big-ticket commitments the council voted on. Each is grouped by the road, the piece of equipment, or the vendor it touched, and linked back to the meeting that proves it.

It's an AI-read research index awaiting human review. It is a companion to, not a replacement for, the official hand-verified budget on the main Money page. Nothing here feeds the tax simulator.

Payments made

$415k

171 itemized checks from the published registers

Bids and contracts approved

$1.18M

26 jobs at an accepted bid, contract, or purchase. Each job counts once at its furthest stage. Estimates and quotes are not added.

Bonds sold

$1.25M

Par amount of the bond sale awarded this year. Authorizations are not added. This is borrowing, not spending.

Where the city published an itemized check register, every line was captured and reconciles to the penny against the printed register total. Where a payment line isn't on record yet, the ledger shows the highest stage that is, whether an accepted bid, an awarded contract, or a capital purchase.

Roads & projects

Every street the record ties money to, from first estimate to awarded contract to the checks written. The headline number is the furthest stage reached. We never add an estimate to the bid to the contract, since they describe the same job.

📍 2026 overlay programEstimate $463k · 2 records$463k→
Estimate · estimateHakanson Anderson (engineer)2026 Overlay Project — preliminary total estimated project cost (construction $393,700 + e…$462,800
Purpose
2026 Overlay Project — preliminary total estimated project cost (construction $393,700 + engineering/legal/admin $59,100 + contingency $10,000); 50% assessment proposed
Notes
Engineering report in Dec 9 packet — not yet bid/awarded; schedule for council determination
Meeting
Dec 9, 2025

Context: Separate bituminous overlay construction estimate $462,800; city share incl. patching estimated $359,400 total per report §6.

Estimate · estimate2026 Overlay — budgetary repair costs 100% city-paid (curb/gutter, full-depth patching, skin patch) before overlay bid$128,000
Purpose
2026 Overlay — budgetary repair costs 100% city-paid (curb/gutter, full-depth patching, skin patch) before overlay bid
Notes
Engineer preliminary budgetary estimate Figure 8 — contracts to be awarded later on unit-price basis
Meeting
Dec 9, 2025

Context: Prepared without final plans/specs; quantities subject to field measurement.

📍 Krypton / Lithium street reconstructionContract $323k · 5 records$323k→
Estimate · estimateHakanson Anderson (engineer)2025 Overlay Project — forecast total project costs (construction $325,000 + engineering $…$371,000
Purpose
2025 Overlay Project — forecast total project costs (construction $325,000 + engineering $37,000 + testing/admin/closeout)
Notes
Supporting estimate for Res. 2025-XX Adopting Assessment Roll for 2025 Overlay Project
Meeting
Oct 14, 2025

Context: Original estimated project cost $403,480; revised overlay assessment basis $315,000 after city-paid patching.

Estimate · estimate2025 overlay improvement project — engineer's estimated construction cost$366,080
Purpose
2025 overlay improvement project — engineer's estimated construction cost
Meeting
Jul 8, 2025

Context: Public-hearing discussion; resident Dave Ross (6060 189th Lane) spoke. Other overlay streets not named in this passage.

Estimate · estimateHakanson Anderson (City Engineer Shane Nelson)Engineer's total overlay improvement cost estimate for 2025 Overlay Project public hearing$366,080
Purpose
Engineer's total overlay improvement cost estimate for 2025 Overlay Project public hearing
Meeting
Jun 17, 2025

Context: Low bid came in about $26,000 under estimate; proposed assessment $3,660.80 per unit at 50% policy.

Accepted bidNorth Valley, Inc.2025 Overlay Project — bituminous overlay on Krypton Street, Lithium Street, 189th Lane, 1…$322,866.68
Purpose
2025 Overlay Project — bituminous overlay on Krypton Street, Lithium Street, 189th Lane, 194th Lane, and Tiger Street
Notes
Resolution accepting low bid of North Valley, Inc. contingent on contract execution and city attorney approval
Meeting
Jun 17, 2025

Context: Other bids: Asphalt Surface Tech $343,423.60; Knife River $344,067.50; Park Construction $345,904.80; Minnesota Paving and Materials $361,583.00; Duininck $413,779.50.

ContractNorth Valley, Inc.2025 Overlay Road Improvement Project — original/current contract price (Pay Application #…$322,866.68
Purpose
2025 Overlay Road Improvement Project — original/current contract price (Pay Application #1 through Sept 29, 2025; engineer Hakanson Anderson)
Notes
Contract let prior to Q4; Q4 packet documents Pay Estimate #1 and assessment roll adoption (Res. 2025-94) confirming project under budget
Meeting
Oct 14, 2025

Context: Award vote not in Q4 extract; contract price documented via contractor pay application. Total Base Bid $322,866.68.

📍 218th Avenue NWAccepted bid $21k · $29k paid in checks · 4 records$29k→
Estimate · estimateClass 5 sand and rip rap for 218th Ave NW culvert replacement (city-furnished)$7,000
Purpose
Class 5 sand and rip rap for 218th Ave NW culvert replacement (city-furnished)
Meeting
Feb 27, 2025

Context: Staff estimate in culvert bid packet; purchase timing when project ready.

Quote · estimateTwo 54-foot culvert pipes for 218th Ave NW culvert replacement (city-furnished materials)$11,440
Purpose
Two 54-foot culvert pipes for 218th Ave NW culvert replacement (city-furnished materials)
Notes
Authorized as part of culvert replacement bid approval (Resolution 2025-14)
Meeting
Feb 27, 2025

Context: Perkins estimate note: 4–6 week lead time to order. Mar 11 staff review found longer culverts and aprons needed, pushing total above $50,000 budget line.

Accepted bidDave Perkins Contracting, Inc.Culvert replacement contractor work — remove and replace dual 60"x50' culvert on 218th Ave…$21,150
Purpose
Culvert replacement contractor work — remove and replace dual 60"x50' culvert on 218th Ave NW
Notes
Resolution accepting bid; adopted Feb 27, 2025 (Resolution 2025-14)
Meeting
Feb 27, 2025

Context: Low bid over JP Premier Excavating ($45,000). City provides culverts, class 5, rip rap, blacktop removal, haul-off, soil correction separately.

PaymentTrueNorth Steel IncCulvert for 218th$28,889.84
Purpose
Culvert for 218th
Account
100-43110-228
Claim #
765
Invoice #
BL0000018286
Notes
Fund: General (100) · Dept: Public Works
Meeting
May 5, 2025
📍 Marble St & Hillside TrailQuote $17k · 1 record$17k→
QuoteDave PerkinsReplace failing culvert at Hillside Trail and Marble St intersection ( engineered by Hakan…$16,510.24
Purpose
Replace failing culvert at Hillside Trail and Marble St intersection ( engineered by Hakanson Anderson when Burns Township)
Notes
MOTION BY COUNCIL MEMBER GLASER, SECONDED BY MAYOR HYBBEN TO APPROVE RESOLUTION 2025-114 ACCEPTING THE QUOTE — 5 AYES
Meeting
Nov 18, 2025

Context: Only one quote obtained (council noted best practice is two). Optional asphalt patch add-on $2,500 if completed by Nov 21 not included in base quote.

📍 Baugh StreetEstimate $4,400 · $3,533.10 paid in checks · 5 records$4,400→
Estimate · estimateBertram Asphalt CompanyPreliminary crosswalk striping estimate — two lines across four streets$4,400
Purpose
Preliminary crosswalk striping estimate — two lines across four streets
Notes
Council discussion only; staff directed per council preference.
Meeting
Aug 12, 2025

Context: Also discusses County Rd 22 and CR 5. Alternate block-style estimate $6,000 ($1,500 × 4 streets) in same RCA.

PaymentCouri & Ruppe, P.L.L.P.22511 Baugh St NW Variance$1,235
Purpose
22511 Baugh St NW Variance
Account
100-41610-316
Claim #
757
Notes
Fund: General (100) · Dept: Administration
Meeting
May 5, 2025
PaymentHakanson Anderson AssociatesOctober Engineering Project 25-26 Baugh St WD$1,205.60
Purpose
October Engineering Project 25-26 Baugh St WD
Account
G 100-24700
Claim #
1253
Invoice #
56229
Meeting
Nov 26, 2025

Context: Escrow payable engineering/developer fee; outbound check from city escrow account

PaymentCouri & Ruppe, P.L.L.P.22511 Baugh ST. NW Variance$585
Purpose
22511 Baugh ST. NW Variance
Account
100-41610-316
Claim #
708
Notes
Fund: General (100) · Dept: Administration
Meeting
Mar 27, 2025
PaymentHakanson Anderson AssociatesOctober Engineering Project 25-25 Baugh St Grading Permit$507.50
Purpose
October Engineering Project 25-25 Baugh St Grading Permit
Account
G 100-24700
Claim #
1253
Invoice #
56229
Meeting
Nov 26, 2025

Context: Escrow payable engineering/developer fee; outbound check from city escrow account

📍 Rogers Lake$306.75 paid in checks · 1 record$306.75→
PaymentHakanson Anderson AssociatesRogers Lake Reconstruction Project$306.75
Purpose
Rogers Lake Reconstruction Project
Account
100-41910-303
Claim #
777
Invoice #
54920
Notes
Fund: General (100) · Dept: Administration
Meeting
May 5, 2025
📍 229th Avenue$130 paid in checks · 1 record$130→
PaymentCouri & Ruppe, P.L.L.P.3-13 8214 229th Lot Split$130
Purpose
3-13 8214 229th Lot Split
Account
100-41610-316
Claim #
757
Notes
Fund: General (100) · Dept: Administration
Meeting
May 5, 2025

Equipment

Big-ticket apparatus the record ties to a specific unit in the city fleet, with the full purchase trail.

🔧 rescue pumper truckContract $514k · 4 records$514k→
Estimate · estimatePreliminary estimate for new fire rescue pumper truck (Fire Chief to add to packet)$505,000
Purpose
Preliminary estimate for new fire rescue pumper truck (Fire Chief to add to packet)
Notes
Passage describes new rescue truck estimate; fleet entry is rescue pumper truck
Meeting
Apr 23, 2025

Context: Preliminary only; later 2025 contract in fleet.json is $514,090.

Spending authorization · not to exceedBond financing for new fire rescue/pumper truck$500,000
Purpose
Bond financing for new fire rescue/pumper truck
Notes
MOTION BY COUNCIL MEMBER RAINVILLE, SECONDED BY COUNCIL MEMBER SWENSON TO MOVE FORWARD WITH BONDING FOR A NEW RESCUE/PUMPER TRUCK NOT TO EXCEED $500,000. 3 AYES … 2 NAYS … MOTION CARRIED.
Meeting
Jul 14, 2025

Context: Chief cited comparable used apparatus at $389,000 and hoped to negotiate final price between $470,000 and $500,000; authorization cap is $500,000.

Equipment certificateGO Bond Series 2025A equipment certificate portion — finance capital equipment (commercial rear-mount pumper and Tool Cat or similar) per Oct 14 bond resolution$600,000
Purpose
GO Bond Series 2025A equipment certificate portion — finance capital equipment (commercial rear-mount pumper and Tool Cat or similar) per Oct 14 bond resolution
Notes
Part of Res. authorizing GO Bonds Series 2025A; equipment certificates $600,000 principal per Ehlers sources/uses table
Meeting
Oct 14, 2025

Context: Financing sub-limit within bond issue, not duplicate vendor spend. 2026 budget also plans $78,000 Tool Cat replacement from equipment fund — separate uncommitted plan.

ContractCustom Fire Apparatus, Inc.Rescue pumper truck — Sourcewell RPCO Commercial 4-Door Rear Mount Pumper (2026 Ford F750 …$514,090
Purpose
Rescue pumper truck — Sourcewell RPCO Commercial 4-Door Rear Mount Pumper (2026 Ford F750 chassis, 1250 GPM pump); chassis prepayment $95,387 due within 10 days; balance due ~Dec 2, 2025 with $20,564 manufacturer discount if paid on schedule
Notes
MOTION BY COUNCIL MEMBER RAINVILLE, SECONDED BY MAYOR HYBBEN, TO APPROVE THE PREPAYMENT FOR THE CHASSIS FOR THE NEW RESCUE PUMP BUMPER TRUCK AND CONTRACT ACCEPTANCE — 4 AYES, 1 NAY (GLASER); Res. 2025-XX
Meeting
Oct 14, 2025

Context: Resolution text also cites total contract $514,090 and prepayment $95,387; prepayment is included in contract total, not additive.

Browse every line

The full index has every commitment the council voted on, plus the itemized payments on record. Group it by category, vendor, street, equipment, or stage.

55 records · $1,184,609.79 approved, each job counted once, estimates and quotes left out

Capital equipment8 items$594,103.90→
Estimate · estimatePreliminary estimate for new fire rescue pumper truck (Fire Chief to add to packet)$505,000
🔧 rescue pumper truck
Purpose
Preliminary estimate for new fire rescue pumper truck (Fire Chief to add to packet)
Notes
Passage describes new rescue truck estimate; fleet entry is rescue pumper truck
Meeting
Apr 23, 2025

Context: Preliminary only; later 2025 contract in fleet.json is $514,090.

QuoteForce (snow and ice control equipment vendor)Snow and ice control accessory equipment quotation (push-bar, scraper, auger, spinner, pup…$186,587
Purpose
Snow and ice control accessory equipment quotation (push-bar, scraper, auger, spinner, pup hoist, controls)
Meeting
Apr 23, 2025

Context: Quote total $186,587; no award motion in extract.

QuoteNuss Truck and EquipmentMack Granite tandem-axle truck cab and chassis quotation (Grand Total in April 23 packet)$169,041.60
Purpose
Mack Granite tandem-axle truck cab and chassis quotation (Grand Total in April 23 packet)
Meeting
Apr 23, 2025

Context: Presentation/quote only; no council award motion in Q2 extract.

ContractCustom Fire Apparatus, Inc.Rescue pumper truck — Sourcewell RPCO Commercial 4-Door Rear Mount Pumper (2026 Ford F750 …$514,090
🔧 rescue pumper truck
Purpose
Rescue pumper truck — Sourcewell RPCO Commercial 4-Door Rear Mount Pumper (2026 Ford F750 chassis, 1250 GPM pump); chassis prepayment $95,387 due within 10 days; balance due ~Dec 2, 2025 with $20,564 manufacturer discount if paid on schedule
Notes
MOTION BY COUNCIL MEMBER RAINVILLE, SECONDED BY MAYOR HYBBEN, TO APPROVE THE PREPAYMENT FOR THE CHASSIS FOR THE NEW RESCUE PUMP BUMPER TRUCK AND CONTRACT ACCEPTANCE — 4 AYES, 1 NAY (GLASER); Res. 2025-XX
Meeting
Oct 14, 2025

Context: Resolution text also cites total contract $514,090 and prepayment $95,387; prepayment is included in contract total, not additive.

Capital purchaseReady Watt ElectricInstall new tornado warning siren — electrical service, pole, programming coordination (in…$25,531
Purpose
Install new tornado warning siren — electrical service, pole, programming coordination (installation budgeted/paid 2026 per staff discussion)
Notes
Res. 2025-XX — installation $25,531 approved alongside Federal Signal equipment
Meeting
Nov 18, 2025

Context: Minutes discussion rounded install to $25,000; resolution and quote state $25,531.

Capital purchaseMacQueenParatech rescue tools for heavy-equipment / entanglement extrication (fire department)$19,987.90
Purpose
Paratech rescue tools for heavy-equipment / entanglement extrication (fire department)
Notes
MOTION TO APPROVE RESOLUTION 2025-115 APPROVAL TO PURCHASE THE PARATECH RESCUE TOOLS — 5 AYES
Meeting
Nov 18, 2025

Context: Quote estimate expiry 11/19/2025; shipping not included per vendor quote.

Capital purchaseFive new sets of fitted firefighter turnout gear for probationary firefighters$19,570
Purpose
Five new sets of fitted firefighter turnout gear for probationary firefighters
Meeting
Aug 12, 2025

Context: Chief Miller reported allocation with finance consultant from existing budget savings; no separate council vote text in passage.

Capital purchaseFederal Signal Corporation130 dB rotating mechanical tornado warning siren + DC control/battery cabinet + shipping (…$14,925
Purpose
130 dB rotating mechanical tornado warning siren + DC control/battery cabinet + shipping (equipment only; Twin Lakes Park location discussed)
Notes
Res. 2025-XX Approval to Purchase Siren and Installation — siren $14,925 approved; 5 AYES on consent/new business per minutes
Meeting
Nov 18, 2025

Context: 2026 budget later budgets combined siren + install at $40,460 fund-balance use.

Road & street projects19 items$458,786.68→
Estimate · estimateHakanson Anderson (engineer)2026 Overlay Project — preliminary total estimated project cost (construction $393,700 + e…$462,800
📍 2026 overlay benefiting properties (64 Nowthen units
Purpose
2026 Overlay Project — preliminary total estimated project cost (construction $393,700 + engineering/legal/admin $59,100 + contingency $10,000); 50% assessment proposed
Notes
Engineering report in Dec 9 packet — not yet bid/awarded; schedule for council determination
Meeting
Dec 9, 2025

Context: Separate bituminous overlay construction estimate $462,800; city share incl. patching estimated $359,400 total per report §6.

Estimate · estimateHakanson Anderson (engineer)2025 Overlay Project — forecast total project costs (construction $325,000 + engineering $…$371,000
📍 Krypton Street
Purpose
2025 Overlay Project — forecast total project costs (construction $325,000 + engineering $37,000 + testing/admin/closeout)
Notes
Supporting estimate for Res. 2025-XX Adopting Assessment Roll for 2025 Overlay Project
Meeting
Oct 14, 2025

Context: Original estimated project cost $403,480; revised overlay assessment basis $315,000 after city-paid patching.

Estimate · estimate2025 overlay improvement project — engineer's estimated construction cost$366,080
📍 189th Lane
Purpose
2025 overlay improvement project — engineer's estimated construction cost
Meeting
Jul 8, 2025

Context: Public-hearing discussion; resident Dave Ross (6060 189th Lane) spoke. Other overlay streets not named in this passage.

Estimate · estimateHakanson Anderson2025 Overlay Project total estimated project cost (construction, engineering/legal/admin, …$366,080
Purpose
2025 Overlay Project total estimated project cost (construction, engineering/legal/admin, contingency)
Meeting
Feb 11, 2025

Context: Engineer's feasibility report in Feb 11 packet; project schedule lists Feb 11 feasibility approval and Mar public improvement hearing. Multiple overlay corridors (Krypton St, Lithium St, Tiger St, 189th Ln, 194th Ln, etc.). Bids not yet opened in Q1.

Estimate · estimateHakanson Anderson (City Engineer Shane Nelson)Engineer's total overlay improvement cost estimate for 2025 Overlay Project public hearing$366,080
📍 Krypton Street
Purpose
Engineer's total overlay improvement cost estimate for 2025 Overlay Project public hearing
Meeting
Jun 17, 2025

Context: Low bid came in about $26,000 under estimate; proposed assessment $3,660.80 per unit at 50% policy.

Estimate · estimateHakanson Anderson2025 Overlay Project estimated city-paid share including patching$220,440
Purpose
2025 Overlay Project estimated city-paid share including patching
Meeting
Feb 11, 2025

Context: Assessment side estimated at $183,040 to benefiting properties (52 units, ~$3,520/unit).

Estimate · estimate2026 Overlay — budgetary repair costs 100% city-paid (curb/gutter, full-depth patching, skin patch) before overlay bid$128,000
📍 2026 Overlay Project area
Purpose
2026 Overlay — budgetary repair costs 100% city-paid (curb/gutter, full-depth patching, skin patch) before overlay bid
Notes
Engineer preliminary budgetary estimate Figure 8 — contracts to be awarded later on unit-price basis
Meeting
Dec 9, 2025

Context: Prepared without final plans/specs; quantities subject to field measurement.

Estimate · estimateHakanson Anderson2025 Overlay Project bituminous patching (100% city-paid portion)$37,400
Purpose
2025 Overlay Project bituminous patching (100% city-paid portion)
Meeting
Feb 11, 2025

Context: Preliminary patching estimate from overlay feasibility report; included in city cost share below.

Estimate · estimateClass 5 sand and rip rap for 218th Ave NW culvert replacement (city-furnished)$7,000
📍 218th Ave NW
Purpose
Class 5 sand and rip rap for 218th Ave NW culvert replacement (city-furnished)
Meeting
Feb 27, 2025

Context: Staff estimate in culvert bid packet; purchase timing when project ready.

Estimate · estimateBertram Asphalt CompanyPreliminary crosswalk striping estimate — two lines across four streets$4,400
📍 223rd St & Baugh St
Purpose
Preliminary crosswalk striping estimate — two lines across four streets
Notes
Council discussion only; staff directed per council preference.
Meeting
Aug 12, 2025

Context: Also discusses County Rd 22 and CR 5. Alternate block-style estimate $6,000 ($1,500 × 4 streets) in same RCA.

QuoteDave PerkinsReplace failing culvert at Hillside Trail and Marble St intersection ( engineered by Hakan…$16,510.24
📍 Marble St
Purpose
Replace failing culvert at Hillside Trail and Marble St intersection ( engineered by Hakanson Anderson when Burns Township)
Notes
MOTION BY COUNCIL MEMBER GLASER, SECONDED BY MAYOR HYBBEN TO APPROVE RESOLUTION 2025-114 ACCEPTING THE QUOTE — 5 AYES
Meeting
Nov 18, 2025

Context: Only one quote obtained (council noted best practice is two). Optional asphalt patch add-on $2,500 if completed by Nov 21 not included in base quote.

Quote · estimateTwo 54-foot culvert pipes for 218th Ave NW culvert replacement (city-furnished materials)$11,440
📍 218th Ave NW
Purpose
Two 54-foot culvert pipes for 218th Ave NW culvert replacement (city-furnished materials)
Notes
Authorized as part of culvert replacement bid approval (Resolution 2025-14)
Meeting
Feb 27, 2025

Context: Perkins estimate note: 4–6 week lead time to order. Mar 11 staff review found longer culverts and aprons needed, pushing total above $50,000 budget line.

QuoteEFAReplace non-compliant street signs — NW quarter inventory, no-logo option (quarterly repla…$578.10
Purpose
Replace non-compliant street signs — NW quarter inventory, no-logo option (quarterly replacement program)
Notes
MOTION BY COUNCIL MEMBER BREYEN, SECONDED BY COUNCIL MEMBER GLASER TO APPROVE THE EFA QUOTE FOR THE NO LOGO OPTION AT $578.10 — 5 AYES
Meeting
Nov 26, 2025

Context: Rejected Option 3 all-city replacement estimate ~$81,918. Logo option ~$13/sign additional per staff RCA (Nov 18).

Accepted bidNorth Valley, Inc.2025 Overlay Project — bituminous overlay on Krypton Street, Lithium Street, 189th Lane, 1…$322,866.68
📍 Krypton Street
Purpose
2025 Overlay Project — bituminous overlay on Krypton Street, Lithium Street, 189th Lane, 194th Lane, and Tiger Street
Notes
Resolution accepting low bid of North Valley, Inc. contingent on contract execution and city attorney approval
Meeting
Jun 17, 2025

Context: Other bids: Asphalt Surface Tech $343,423.60; Knife River $344,067.50; Park Construction $345,904.80; Minnesota Paving and Materials $361,583.00; Duininck $413,779.50.

Accepted bid · not to exceedNorthern SaltPurchase and application of 38% calcium chloride dust control on ~10 miles of class 5 road…$50,560
Purpose
Purchase and application of 38% calcium chloride dust control on ~10 miles of class 5 roadways (9 segments)
Notes
Resolution 2025-27 accepting bid; 5 ayes Mar 27, 2025
Meeting
Mar 27, 2025

Context: Lowest of two quotes (Envirotech $69,700). Actual cost based on gallons applied ($1.60/gal, ~31,600 gal). Streets include Zeolite, 223rd, Hillside Trail, Variolite, Xenon, Verde Valley, Basalt, W Ford Brook, 205th Ave.

Accepted bidBertram Asphalt Company2025 crack-filling of city asphalt roads (up to 23,000 lbs seal material; maps in packet)$43,010
Purpose
2025 crack-filling of city asphalt roads (up to 23,000 lbs seal material; maps in packet)
Notes
Staff recommended approving resolution authorizing Bertram Asphalt; vote text not in compressed passage
Meeting
Apr 8, 2025

Context: Competing quote: Diversified Paving $44,100 (not selected). Council vote not quoted in extract.

Accepted bidDave Perkins Contracting, Inc.Culvert replacement contractor work — remove and replace dual 60"x50' culvert on 218th Ave…$21,150
📍 218th Ave NW
Purpose
Culvert replacement contractor work — remove and replace dual 60"x50' culvert on 218th Ave NW
Notes
Resolution accepting bid; adopted Feb 27, 2025 (Resolution 2025-14)
Meeting
Feb 27, 2025

Context: Low bid over JP Premier Excavating ($45,000). City provides culverts, class 5, rip rap, blacktop removal, haul-off, soil correction separately.

ContractNorth Valley, Inc.2025 Overlay Road Improvement Project — original/current contract price (Pay Application #…$322,866.68
📍 Krypton Street
Purpose
2025 Overlay Road Improvement Project — original/current contract price (Pay Application #1 through Sept 29, 2025; engineer Hakanson Anderson)
Notes
Contract let prior to Q4; Q4 packet documents Pay Estimate #1 and assessment roll adoption (Res. 2025-94) confirming project under budget
Meeting
Oct 14, 2025

Context: Award vote not in Q4 extract; contract price documented via contractor pay application. Total Base Bid $322,866.68.

ContractMoore EngineeringAsphalt road condition study for city (approximately four weeks)$21,200
Purpose
Asphalt road condition study for city (approximately four weeks)
Notes
Motion to authorize Moore Engineering asphalt road study and estimate for gravel road study — 3 ayes, 2 nays, motion carried
Meeting
May 13, 2025

Context: Minutes excerpt in file contains mismatched official names (Pilon, Fladebo, Alders); treat as OCR contamination but dollar figure and vendor are clear.

Utilities1 item$72,523.36→
Contract · not to exceedAnoka CountyJoint Powers Agreement for county-led storm sewer project — city construction and engineer…$72,523.36
Purpose
Joint Powers Agreement for county-led storm sewer project — city construction and engineering share (Contract C0011437)
Notes
JPA executed by Mayor Shane Hybben and County Administrator Jim Dickinson; amendment caps city share and sets three equal annual payments.
Meeting
Aug 12, 2025

Context: Includes $67,151.26 estimated construction + $5,372.10 engineering (8%). Initial 95% billing estimated at $68,897.19 prior to bid-price update. Project street/location not named in passage.

Professional services11 items$41,318.30→
Quote · not to exceedSouth Central Service CooperativeCity Administrator executive search services (proposal)$14,500
Purpose
City Administrator executive search services (proposal)
Meeting
Feb 11, 2025

Context: SCSC proposal in Feb 11 packet; staff indicated search would not start until fifth council member seated. No Q1 approval motion found in passages.

ContractBerganKDV2025 financial-statement audit fee (three-year audit proposal 2025–2027)$23,850
Purpose
2025 financial-statement audit fee (three-year audit proposal 2025–2027)
Notes
MOTION BY COUNCIL MEMBER BREYEN, SECONDED BY COUNCIL MEMBER RAINVILLE TO APPROVE RESOLUTION 2025-XX ACCEPTING THE FEES FOR BERGANKDV AUDIT SERVICES FOR 2025-2026-2027. 5 AYES. MOTION CARRIED.
Meeting
Aug 20, 2025

Context: Companion 2025 drafting fee $3,425; 2026 audit $24,750; 2027 audit $25,685. Single-audit add-on $4,500–$6,500 per year if applicable.

ContractBaseline Technologies, Inc.Consulting agreement to prepare SolarAPP+ grant application; fee payable only if state gra…$5,000
Purpose
Consulting agreement to prepare SolarAPP+ grant application; fee payable only if state grant awarded (Resolution 2025-83)
Notes
MOTION BY COUNCIL MEMBER BREYEN, SECONDED BY COUNCIL MEMBER RAINVILLE TO APPROVE RESOLUTION 2025-83 … 5 AYES, MOTION CARRIED.
Meeting
Aug 12, 2025

Context: Contingent outflow; Commerce Department grant could total $10,000 to city if approved.

ContractCivicPlus / AudioEye / AlyantADA compliance software for city website — 6-month trial then 50% year-one charge $1,971.6…$3,943.30
Purpose
ADA compliance software for city website — 6-month trial then 50% year-one charge $1,971.65 mid-2026, full prorated $3,943.30 due Oct 2026 with website renewal (addition to existing CivicPlus contract)
Notes
Consent agenda — Res. 2025-XX Authorizing Payment for ADA Compliance Software (AudioEye & Alyant)
Meeting
Nov 18, 2025

Context: Oct 14 RCA cited $2,500/yr AudioEye + $1,450/yr Alyant ($3,950); Nov 18 revised payment schedule. No 2025 cash outlay.

ContractBerganKDV2025 financial-statement drafting fee under BerganKDV audit proposal$3,425
Purpose
2025 financial-statement drafting fee under BerganKDV audit proposal
Notes
MOTION BY COUNCIL MEMBER BREYEN, SECONDED BY COUNCIL MEMBER RAINVILLE TO APPROVE RESOLUTION 2025-XX ACCEPTING THE FEES FOR BERGANKDV AUDIT SERVICES FOR 2025-2026-2027. 5 AYES. MOTION CARRIED.
Meeting
Aug 20, 2025

Context: Separate line item in BerganKDV August 8, 2025 fee letter.

ContractRum River Consultants (Rum River Ventures, LLC)Annual MPCA SSTS reporting fee (due each March)$2,000
Purpose
Annual MPCA SSTS reporting fee (due each March)
Notes
Included in Resolution 2025-65 approval — 5 AYES, MOTION CARRIED
Meeting
Jun 10, 2025

Context: Compliance-program hourly fees ($90/hr enforcement) are separate and usage-dependent.

ContractRum River ConsultantsAnnual septic compliance reporting fee under Resolution 2025-65$2,000
Purpose
Annual septic compliance reporting fee under Resolution 2025-65
Notes
MOTION BY COUNCIL MEMBER RAINVILLE, SECONDED BY COUNCIL MEMBER SWENSON TO APPROVE RESOLUTION 2025-65 … 5 AYES, MOTION CARRIED.
Meeting
Jul 8, 2025

Context: Recurring annual fee stated alongside the $900 ordinance-revision cost.

ContractRobert MillerExtend interim Fire Chief/Emergency Manager employment agreement through December 31, 2027$1,200
Purpose
Extend interim Fire Chief/Emergency Manager employment agreement through December 31, 2027
Notes
Resolution extends contract; weekly compensation increases to $1,200 effective January 1, 2026 through December 31, 2027
Meeting
May 13, 2025

Context: Amount is weekly wage from 2026 onward; compensation through December 31, 2025 remains per existing agreement (rate not in extract).

Contract · not to exceedRum River Consultants (Rum River Ventures, LLC)First Amendment — annual MPCA SSTS reporting under Building Official services agreement$1,000
Purpose
First Amendment — annual MPCA SSTS reporting under Building Official services agreement
Notes
Council action item: motion to approve First Amendment to Agreement for Building Official Services (effective 2025-09-09).
Meeting
Sep 9, 2025

Context: Amendment also sets hourly/permit rates ($90/hr compliance, $350 residential septic permits, etc.); only annual reporting cap extracted here.

Contract · not to exceedRum River Consultants (Rum River Ventures, LLC)Revise city subsurface sewage treatment system (SSTS) ordinance (repeal and replace; 8–10 …$900
Purpose
Revise city subsurface sewage treatment system (SSTS) ordinance (repeal and replace; 8–10 hours estimated)
Notes
APPROVE RESOLUTION 2025-65 — 5 AYES, MOTION CARRIED
Meeting
Jun 10, 2025
ContractRum River ConsultantsRevise septic system ordinance and implement septic compliance system (Resolution 2025-65)$900
Purpose
Revise septic system ordinance and implement septic compliance system (Resolution 2025-65)
Notes
MOTION BY COUNCIL MEMBER RAINVILLE, SECONDED BY COUNCIL MEMBER SWENSON TO APPROVE RESOLUTION 2025-65 … 5 AYES, MOTION CARRIED.
Meeting
Jul 8, 2025

Context: Same resolution also authorizes a $2,000 annual reporting fee; not summed into amount.

Other5 items$12,883.16→
QuoteRent.FunSelf-service kayak rental station at Twin Lakes Park (four-unit activation; August signing…$19,000
Purpose
Self-service kayak rental station at Twin Lakes Park (four-unit activation; August signing discount)
Notes
Council asked to decide whether to enter contract; no approval motion in compressed passage.
Meeting
Aug 12, 2025

Context: Vendor also quoted $20,000 standard four-unit fee and $19,000 split ($10,000 + $10,000 Jan 2026) if signed in August. Optional game kiosk $3,000 mentioned separately.

QuoteBertram Asphalt CompanyStripe two pickleball courts and one half-court basketball court at memorial park$1,920
Purpose
Stripe two pickleball courts and one half-court basketball court at memorial park
Notes
APPROVE RESOLUTION 2025-66 ACCEPTING QUOTE — 5 AYES, MOTION CARRIED; funding from Parks Capital
Meeting
Jun 10, 2025

Context: RCA dated June 10, 2025; council action recorded June 17, 2025.

ContractUpper Rum River Watershed Management OrganizationNowthen's ratified share of URRWMO 2026 draft budget$11,933.21
Purpose
Nowthen's ratified share of URRWMO 2026 draft budget
Notes
Ratify 2026 URRWMO budget and Nowthen portion $11,933.21; 5 ayes Mar 27, 2025
Meeting
Mar 27, 2025

Context: Joint powers watershed organization contribution; includes $10,000 toward 2027–2028 watershed plan update in org budget.

ContractMary Lieser; Sara JensenFarmers Market Coordinator stipend ($500) and Market Manager stipend ($250)$750
Purpose
Farmers Market Coordinator stipend ($500) and Market Manager stipend ($250)
Meeting
Apr 8, 2025

Context: Resolution text references 2024 coordinator/manager titles; payment upon council approval.

ContractVerizonFive business cellphone lines (4G Custom Unlimited for Public Safety) at $39.99/line/month…$199.95
Purpose
Five business cellphone lines (4G Custom Unlimited for Public Safety) at $39.99/line/month; five iPhone 14 devices at $0 net with 2-year agreement
Notes
Approve Verizon Phones Proposal on Feb 27 consent agenda
Meeting
Feb 27, 2025

Context: Amount is monthly recurring for 5 lines before taxes/surcharges; sixth line planned when new administrator hired. Device protection declined.

Buildings & grounds10 items$3,189.39→
QuoteTR Concrete, Inc.Nowthen Veterans Memorial — concrete scope $16,500 + excavation/demo scope $16,500 (total …$20,300
Purpose
Nowthen Veterans Memorial — concrete scope $16,500 + excavation/demo scope $16,500 (total bid $20,300 per committee minutes; line items sum $33,000 in proposal header — use committee-stated $20,300 as governing total)
Notes
Committee minutes cite bid $20,300; no council award
Meeting
Oct 21, 2025

Context: Proposal shows $16,500 + $16,500 scope lines and printed total $20,300; committee awaiting colored/stamped alternates.

QuoteMinnesota Metal Exteriors, LLCTwin Lakes Park metal roof replacement (four pavilion shelters at $4,350 each)$17,400
Purpose
Twin Lakes Park metal roof replacement (four pavilion shelters at $4,350 each)
Notes
Staff recommended accepting lower quote; council vote not in compressed June 17 minutes
Meeting
Jun 10, 2025

Context: Alternate: Wild Construction $17,760 ($4,440 per shelter).

QuoteFallon Construction ServicesNowthen Veterans Memorial — plain broom concrete base (~1,410 sq ft); excludes flag poles,…$13,650
Purpose
Nowthen Veterans Memorial — plain broom concrete base (~1,410 sq ft); excludes flag poles, monuments, utilities
Notes
Veterans Memorial Renovation Committee minutes — bids received; no City Council award in Q4 extract
Meeting
Oct 21, 2025

Context: Committee-level bid, not council-awarded. Estimate #1123 dated 10/18/2025.

QuotePrecision SparksVeterans Memorial metal fabrication — five military branch cutouts + two soldier silhouett…$8,586
Purpose
Veterans Memorial metal fabrication — five military branch cutouts + two soldier silhouettes, powder coated (invoice total incl. tax $8,586)
Notes
Committee minutes — bid received $8,586; no council award
Meeting
Oct 21, 2025

Context: Subtotal $7,950 + tax $636 = $8,586.

QuoteWild Construction CO, LLC; Stanley Access TechnologiesHistoric town hall main entrance door replacement ($1,671.44) plus handicap door activatio…$5,071.44
Purpose
Historic town hall main entrance door replacement ($1,671.44) plus handicap door activation button ($3,400.00)
Notes
Staff recommended combined quotes; council vote not in compressed extract
Meeting
Jun 10, 2025

Context: Competing combined scope quote: O&L Door Systems $9,457.09. May 13 packet had button-only quote $3,400.

QuoteAmerican Flagpole & Flag Co.Veterans Memorial renovation — two flagpoles (excludes tax)$3,886
Purpose
Veterans Memorial renovation — two flagpoles (excludes tax)
Meeting
Sep 30, 2025

Context: Committee-level bid comparison only; not council-awarded.

Quote · range lowFalls Flag SourceVeterans Memorial renovation — single flagpole option (excludes tax)$2,795
Purpose
Veterans Memorial renovation — single flagpole option (excludes tax)
Meeting
Sep 30, 2025

Context: Alternate quote $3,695 for one pole also stated; committee has not selected vendor.

Capital purchaseNorth Metro GlassSafety glass purchase and installation at Nowthen City Office front counter (lowest of two…$1,740.40
Purpose
Safety glass purchase and installation at Nowthen City Office front counter (lowest of two quotes)
Notes
Res. 2025-XX Approving Purchase and Installation of Safety Glass — staff authorized North Metro Glass $1,740.40
Meeting
Nov 18, 2025

Context: Alternate quote J&A Glass $2,209.00.

Capital purchaseMicro-CenterEpson Pro Projector model EX9240 for Historic Town Hall meeting displays$849.99
Purpose
Epson Pro Projector model EX9240 for Historic Town Hall meeting displays
Notes
Resolution approving projector purchase with two-week return option
Meeting
Mar 27, 2025

Context: Staff recommended Option 2 (portable, no ceiling mount). New Age Technologies ceiling-mount option quoted at $5,197 not selected.

Capital purchaseMicro-Center (Epson Pro Projector EX9240)Keep purchased historic town hall projector (paid $599 vs $849.99 quoted)$599
Purpose
Keep purchased historic town hall projector (paid $599 vs $849.99 quoted)
Notes
Motion to keep projector in historic town hall as adequate quality
Meeting
Apr 29, 2025

Context: Original Resolution 2025-26 approved purchase March 27, 2025.

Equipment repair1 item$1,805→
ContractGenerator Power SystemsPreventative maintenance contract for city office and fire station generators, February 20…$1,805
Purpose
Preventative maintenance contract for city office and fire station generators, February 2025 through January 2026
Notes
Resolution authorizing mayor to execute generator maintenance contract; adopted consent agenda January 14, 2025
Meeting
Jan 14, 2025

Context: Quote covers annual preventative service only; repair labor and parts billed separately per contract terms.

Bond financing (kept out of spending)

These are debt actions (authorizing or selling bonds) that bring money in to fund streets and equipment. They are not a 2025 expense, so they are listed here on their own rather than counted with the payments above. The bonds sold figure at the top counts only the awarded sale, since the authorization and the equipment and fire truck lines describe the same borrowing.

Spending authorization · not to exceedEhlers and Associates, Inc. (municipal advisor); bond purchasers TBDAuthorize issuance/sale of General Obligation Bonds, Series 2025A — proposed aggregate pri…$1,460,000
Purpose
Authorize issuance/sale of General Obligation Bonds, Series 2025A — proposed aggregate principal (subject to adjustment): $470,000 (2024 street projects), $390,000 (2025 street projects), $600,000 (capital equipment incl. rescue pumper and Tool Cat or similar)
Notes
MOTION BY COUNCIL MEMBER RAINVILLE, SECONDED BY MAYOR HYBBEN TO APPROVE A RESOLUTION PROVIDING FOR THE ISSUANCE AND SALE OF GENERAL OBLIGATION BONDS SERIES 2025A IN THE PROPOSED AGGREGATE PRINCIPAL AMOUNT OF $1,460,000 WHICH IS SUBJECT TO CHANGE — 5 AYES (Res. 2025-93 presale)
Meeting
Oct 14, 2025

Context: Financing authorization, not a vendor invoice. Final par reduced at award (see 2025-11-18 record). Equipment certificate portion $600,000 per resolution WHEREAS clauses.

Accepted bidBaird (winning bond purchaser)Award sale of General Obligation Bonds, Series 2025A — final par $1,250,000 (reduced from …$1,250,000
Purpose
Award sale of General Obligation Bonds, Series 2025A — final par $1,250,000 (reduced from $1,405,000/$1,460,000 authorized) due to premium bid; 6 competitive bids; true interest cost 2.96%; funding maintained for 2024 streets, 2025 streets, and equipment acquisition
Notes
MOTION BY COUNCIL MEMBER RAINVILLE, SECONDED BY MAYOR HYBBEN, TO APPROVE RESOLUTION 2025-104 AWARDING THE SALE OF GENERAL OBLIGATION BOND SERIES 2025A IN THE ORIGINAL AGGREGATE PRINCIPAL AMOUNT OF $1,250,000 — 4 AYES, 1 NAY (GLASER)
Meeting
Nov 18, 2025

Context: Debt issuance award, not a construction/vendor contract. Ehlers pre-sale had assumed $1,460,000 then $1,405,000; award par $1,250,000. Closing/delivery Dec 10, 2025.

Equipment certificateGO Bond Series 2025A equipment certificate portion — finance capital equipment (commercial rear-mount pumper and Tool Cat or similar) per Oct 14 bond resolution$600,000
🔧 rescue pumper truck
Purpose
GO Bond Series 2025A equipment certificate portion — finance capital equipment (commercial rear-mount pumper and Tool Cat or similar) per Oct 14 bond resolution
Notes
Part of Res. authorizing GO Bonds Series 2025A; equipment certificates $600,000 principal per Ehlers sources/uses table
Meeting
Oct 14, 2025

Context: Financing sub-limit within bond issue, not duplicate vendor spend. 2026 budget also plans $78,000 Tool Cat replacement from equipment fund — separate uncommitted plan.

Spending authorization · not to exceedBond financing for new fire rescue/pumper truck$500,000
🔧 rescue pumper truck
Purpose
Bond financing for new fire rescue/pumper truck
Notes
MOTION BY COUNCIL MEMBER RAINVILLE, SECONDED BY COUNCIL MEMBER SWENSON TO MOVE FORWARD WITH BONDING FOR A NEW RESCUE/PUMPER TRUCK NOT TO EXCEED $500,000. 3 AYES … 2 NAYS … MOTION CARRIED.
Meeting
Jul 14, 2025

Context: Chief cited comparable used apparatus at $389,000 and hoped to negotiate final price between $470,000 and $500,000; authorization cap is $500,000.

Spending authorization · not to exceedSpring and Fall 2025 newsletter printing and postage (plus any ad revenues collected)$8,650
Purpose
Spring and Fall 2025 newsletter printing and postage (plus any ad revenues collected)
Meeting
Apr 8, 2025
Spending authorization · not to exceedAdministrative and Public Works staff/monetary assistance to Farmers Market as needed$1,750
Purpose
Administrative and Public Works staff/monetary assistance to Farmers Market as needed
Meeting
Apr 8, 2025
Spending authorization · not to exceedCity contribution cap per pair of required public-works/recycling safety boots (Resolution 2025-73, amended)$225
Purpose
City contribution cap per pair of required public-works/recycling safety boots (Resolution 2025-73, amended)
Notes
MOTION BY COUNCIL MEMBER RAINVILLE, SECONDED BY MAYOR HYBBEN TO APPROVE RESOLUTION 2025-73 WITH AMENDMENTS.
Meeting
Aug 12, 2025

Context: Amendments removed vendor restriction (any store) and set $225 cap; per-pair not aggregate.

Spending authorization · not to exceedPurchase and install purple lights at Historic Town Hall for Domestic Violence Awareness Month$80
Purpose
Purchase and install purple lights at Historic Town Hall for Domestic Violence Awareness Month
Notes
Staff RCA requests council approve purchase/placement; funding 100-41710-491 not to exceed $80.
Meeting
Aug 12, 2025

Context: No vote outcome in compressed passage.

These rows come from the 2025 index of dollar figures in the meeting record. Reviewers can approve or correct these rows on the money review screen.