Oak Grove City Council Work Session meeting, June 27, 2022
Council Work SessionMonday, June 27, 2022
What happened
Council held a work session where Buetow 2 Architects presented two facility sketch concepts (D3 remodel/addition vs. E3 new building) with estimated project costs of $10,180,000 and $9,130,000.
What was on the agenda
1 item as recorded in the minutes, each with a short summary of what was at issue.
- Discussion only
1Facility Needs Study Presentation and Discussion with Buetow 2 Architects, Inc.
Presentation of sketch concept drawings for facility needs study (Concepts D3 and E3), including estimated project costs and facility features.
At this work session, the council heard a facility needs study presentation from Buetow 2 Architects. Randy Engel presented two sketch concept drawings (D3 and E3) that both include four double drive-through apparatus bays with future expansion and a future rest/study/sleep suite addition; D3 was described as an addition and remodel estimated at $10,180,000, while E3 was described as a new free-standing building estimated at $9,130,000.
Work session minutes record a presentation/discussion but no motion or action.
- Facility needs study / fire station concepts
Alternatives considered
Options the council weighed, and what happened to them. The record of the road not taken.
Facility concept selection (D3 vs. E3)
mentioned onlyConcept D3 (addition and remodel)
Cost comparison: Estimated project cost $10, 180,000 (D3) vs. $9,130,000 (E3).
Why: Minutes record concepts and costs but do not record any decision or direction.
Raised by Randy Engel
Facility concept selection (D3 vs. E3)
mentioned onlyConcept E3 (new free-standing building)
Cost comparison: Estimated project cost $9,130,000 (E3) vs. $10, 180,000 (D3).
Why: Minutes record concepts and costs but do not record any decision or direction.
Raised by Randy Engel
Sources
Documents and recordings archived for this meeting, when available.
Agenda
Not in this archive
What was on the agenda.
Packet
Not in this archive
The supporting materials the board reviewed.
The summary on this page is AI-extracted and may need correction. The PDFs and the meeting recording are the official record. What do the trust labels mean?